|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 9/1/2024 Measured TD: 7578 ft. Vertical TD: 7438 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 9/1/2024 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 1/18/2012 | Proposed Top PZ Location: | Sec:33 Twp: 4N 67W | Footage: 2006 FNL 1973 FWL | Bottom Hole Location: | Sec:33 Twp: 4N 67W | Footage: 2006 FNL 1973 FWL | Proposed Depth/Form: | 8208 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: S/2NW/4 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: N/2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: E/2 NW4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 700 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 420, Top: 0 ft., Bottom: 700 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8208 ft., Weight: 11.5 , Citings Type: PLANNED | Cement: | Sacks: 750, Top: , Bottom: 8208 ft. |
| | |
Wellbore Completed | Completion Date: | 4/27/2011 | Spud Date: | 4/22/2011 | Spud Date Is: | ACTUAL | Measured TD: | 7578 ft. | Measured PB depth: | 7545 ft. | True Vertical TD: | 7438 ft. | True Vertical PB depth: | 7405 ft. | Top PZ Location: | Sec:33 Twp: 4N 67W | Footage: 2006 FNL 1973 FWL | Bottom Hole Location: | Sec:33 Twp: 4N 67W | Footage: 2006 N 1973 W | Log Types: | | Log Types: | CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 736 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 520, Top: 0 ft., Bottom: 736 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7559 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 480, Top: 3580 ft., Bottom: 7559 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3753 ft. | | | | SUSSEX | 4248 ft. | | | | SHANNON | 4790 ft. | | | | NIOBRARA | 7114 ft. | | | | FORT HAYS | 7380 ft. | | | | CODELL | 7402 ft. | | | | GREENHORN | 7456 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 6/24/2024 Interval Top: 7402 ft. Interval Bottom: 7422 ft. Completed Information for Formation CODELL | 1st Production Date: | 6/29/2011 | Choke Size: | | Formation Name: | CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 6/16/2011 | Treatment Summary: | MIRU Halliburton call for max press 5000 psi kickouts 4800psi open well 13:09
Begin pumping active pad formation broke @ 4068 psi@ 4.7 bpm ISIP 3052psi
after 1 min 2884psi after 5min 2576psi leakoff 476psi
begin pumping FR PAD pump762.5 bbls begin pumping crosslenk pad pump
1 thru 4 ppg 250,840 # 20/40 ottawa sand 2244.4 bbls pHaser.
22124.4 bbls SLF flush 115 bbls LOAD TO RECOVER 3245.3 BBLS
Average press 4364 psi average Rate 48.8 bpm Max press 4950 psi max rate 53.4 bpm.
ISIP 3629 psi
1 min 3408 psi
5min 3291 psi
10 min 3226 psi
15 min 3180 psi shut well in 14:30
|
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 6 | BBLS_OIL | 72 | BTU_GAS | 1427 | CALC_BBLS_H2O | 6 | CALC_BBLS_OIL | 72 | CALC_GOR | 2486 | CALC_MCF_GAS | 179 | GRAVITY_OIL | 49 | MCF_GAS | 179 |
| Perforation Data: | Interval Top: | 7402 ft. | # Of Holes: | 80 | Interval Bottom: | 7422 ft. | Hole Size: | 0.4 in. |
|
Formation NB-CD Formation Classification: OW Status: PR - 9/1/2024 Interval Top: 7116 ft. Interval Bottom: 7422 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 12/15/2017 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7116 ft. | # Of Holes: | 376 | Interval Bottom: | 7422 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 7/10/2024 Interval Top: 7116 ft. Interval Bottom: 7296 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 12/15/2017 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7116 ft. | # Of Holes: | 296 | Interval Bottom: | 7296 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 766 |
Total Gas Produced (MCF) | 6910 |
GOR | 9020 |
GOR Determination | BOE |
Average BOE per Day | 5.369 |
Average MCFE per Day | 31.117 |
Federal Financial Assurance | i | |
|
|