|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 3/11/2020 Measured TD: 7870 ft. Vertical TD: 7780 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 3/11/2020 | Wellbore Permit | DIRECTIONAL | Permit #: | 20086293 | Expiration Date: | 11/20/2009 | Proposed Top PZ Location: | Sec:33 Twp: 3N 68W | Footage: 664 FSL 650 FWL | Bottom Hole Location: | Sec:33 Twp: 3N 68W | Footage: 664 FSL 650 FWL | Proposed Depth/Form: | 7693 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: S2SW4 |
| | |
Wellbore Completed | Completion Date: | N/A | Spud Date: | 1/12/2009 | Spud Date Is: | ACTUAL | Measured TD: | 7870 ft. | Measured PB depth: | 7830 ft. | True Vertical TD: | 7780 ft. | True Vertical PB depth: | 7740 ft. | Top PZ Location: | Sec:33 Twp: 3N 68W | Footage: 664 FSL 650 FWL | Bottom Hole Location: | Sec:33 Twp: 3N 68W | Footage: 664 S 650 W | Log Types: | CD/CN/ML, CBL, DIL | Log Types: | | Log Types: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 885 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 560, Top: 0 ft., Bottom: 885 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7860 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 820, Top: 2266 ft., Bottom: 7860 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1500 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 152, Top: 720 ft., Bottom: 1504 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 1800 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 184, Top: 1765 ft., Bottom: 2000 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3529 ft. | | N | N | SUSSEX | 4010 ft. | | N | N | SHANNON | 4538 ft. | | N | N | NIOBRARA | 7018 ft. | | N | N | FORT HAYS | 7257 ft. | | N | N | CODELL | 7278 ft. | | N | N | J SAND | 7716 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 6/21/2009 Interval Top: 7280 ft. Interval Bottom: 7300 ft. Completed Information for Formation CODELL | 1st Production Date: | 5/11/2009 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/4/2009 | Treatment Summary: | 150,537 GALS FLUID & 150,120 LBS 30/50 SAND & 4,000 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7280 ft. | # Of Holes: | 60 | Interval Bottom: | 7300 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 3/12/2020 Interval Top: 7070 ft. Interval Bottom: 7300 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 5/11/2009 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/4/2009 | Treatment Summary: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BTU_GAS | 1245 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 88 | CALC_GOR | 2020 | CALC_MCF_GAS | 177 | CASING_PRESS | 500 | GRAVITY_OIL | 51 |
| Perforation Data: | Interval Top: | 7070 ft. | # Of Holes: | 126 | Interval Bottom: | 7300 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 6/21/2009 Interval Top: 7070 ft. Interval Bottom: 7160 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 5/11/2009 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/9/2009 | Treatment Summary: | 264,806 GALS FLUID & 205,020 LBS 30/50 SAND & 8,000 20/40 SB EXCEL. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7070 ft. | # Of Holes: | 66 | Interval Bottom: | 7160 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 03/12/2020 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|