|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 6/14/2023 Measured TD: 7780 ft. Vertical TD: 7685 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 6/14/2023 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20086283 | Expiration Date: | 11/20/2009 | | Proposed Top PZ Location: | Sec:29 Twp: 2N 68W | Footage: 64 FSL 1288 FWL | | Bottom Hole Location: | Sec:29 Twp: 2N 68W | Footage: 60 FSL 1297 FWL | | Proposed Depth/Form: | 7771 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 800 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 560, Top: 0 ft., Bottom: 800 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7771 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 7771 ft. |
| | |
| Wellbore Completed | | Completion Date: | 9/18/2009 | | Spud Date: | 9/14/2009 | Spud Date Is: | ACTUAL | | Measured TD: | 7780 ft. | Measured PB depth: | 7728 ft. | | True Vertical TD: | 7685 ft. | True Vertical PB depth: | 7633 ft. | | Top PZ Location: | Sec:29 Twp: 2N 68W | Footage: 64 FSL 1288 FWL | | Bottom Hole Location: | Sec:29 Twp: 2N 68W | Footage: 60 FSL 1297 FWL | | Log Types: | DI-GL-GR, CD-CN-ML, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 818 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 260, Top: 0 ft., Bottom: 818 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7764 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 910, Top: 2900 ft., Bottom: 7764 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3912 ft. | 4112 ft. | | | | SUSSEX | 4339 ft. | 4570 ft. | | | | SHANNON | 4894 ft. | 4955 ft. | | | | NIOBRARA | 7300 ft. | | | | | FORT HAYS | 7585 ft. | | | | | CODELL | 7606 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 6/14/2023 Interval Top: 7607 ft. Interval Bottom: 7625 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 1/26/2010 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/8/2009 | | Treatment Summary: | 205,426 GALS FLUID & 151,260 LBS 40/70 SAND & 4,000 LBS 20/40 SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7607 ft. | # Of Holes: | 54 | | Interval Bottom: | 7625 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 6/14/2023 Interval Top: 7302 ft. Interval Bottom: 7625 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/26/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/10/2010 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1246 | | CALC_BBLS_OIL | 39 | | CALC_GOR | 2872 | | CALC_MCF_GAS | 112 | | CASING_PRESS | 2000 | | GRAVITY_OIL | 51 |
| | Perforation Data: | | Interval Top: | 7302 ft. | # Of Holes: | 120 | | Interval Bottom: | 7625 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 6/14/2023 Interval Top: 7302 ft. Interval Bottom: 7494 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 1/26/2010 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/9/2009 | | Treatment Summary: | 500 GALS ACID & 242,974 GALS FLUID & 200,260 LBS 40/70 SAND & 4,000 LBS 20/40 SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7302 ft. | # Of Holes: | 66 | | Interval Bottom: | 7494 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 06/14/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|