Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-29444
Well Classification: GW Status: PA - 6/13/2023
Well Name/No:SATER #19F-UNIOIL
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date6/13/2023
FacilityID:299605LocationID:302599
County:WELD #123Location:NWNW 19 4N63W 6
Field:WATTENBERG - #90750Elevation:4680 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1183FNL  130 FWLLat/Long: 40.301670 / -104.489270Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.301630 / -104.489240Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 6/13/2023             Measured TD: 6918 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 6/13/2023
Wellbore Permit
Permit #: Expiration Date:10/18/2010
Proposed Depth/Form:7370 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA

Wellbore Completed
Completion Date:11/14/2009
Spud Date:11/11/2009Spud Date Is:ACTUAL
Measured TD:6918 ft.Measured PB depth:6841 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL, CNL/CDL, DUAL INDUCTION
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 521 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 370, Top: 0 ft., Bottom: 521 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 6878 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 670, Top: 780 ft., Bottom: 6878 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6477 ft.NN
FORT HAYS6718 ft.NN
CODELL6742 ft.NN

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 6/13/2023                 Interval Top: 6485 ft.    Interval Bottom: 6750 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:12/14/2009Choke Size:0.250 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/7/2009
Treatment Summary:NIOBRARA "A" 6485'-6487' (4 HOLES), NIOBRARA "B" 6552'-6558' (12 HOLES) CODELL 6744'-6750' (12 HOLES) FRAC'D NIOBRARA/CODELL USING 1000 GALS 15% HCL, 1072 BBLS SLICKWATER PAD, 714 BBLS SILVERSTIM 22# PAD, 2772 BBLS OF SILVERSTIM 22# FLUID SYSTEM,
Tubing Size:2.375 in.Tubing Setting Depth:6729 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 5
BBLS_OIL 18
BTU_GAS 1274
CALC_BBLS_H2O 5
CALC_BBLS_OIL 18
CALC_GOR 4722
CALC_MCF_GAS 85
CASING_PRESS 287
GRAVITY_OIL 49
MCF_GAS 85
Perforation Data:
Interval Top:6485 ft.# Of Holes:28
Interval Bottom:6750 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY06/13/2023
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No