|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 5/23/2018 Measured TD: 8368 ft. Vertical TD: 8289 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 5/23/2018 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 8/23/2012 | Proposed Top PZ Location: | Sec:35 Twp: 2N 68W | Footage: 756 FSL 1984 FWL | Bottom Hole Location: | Sec:35 Twp: 2N 68W | Footage: 761 FSL 1991 FWL | Proposed Depth/Form: | 8368 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W/2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: S/2SW4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 929 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 580, Top: 0 ft., Bottom: 929 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8353 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 670, Top: 4402 ft., Bottom: 8353 ft. |
| | |
Wellbore Completed | Completion Date: | 3/14/2009 | Spud Date: | 3/10/2009 | Spud Date Is: | ACTUAL | Measured TD: | 8368 ft. | Measured PB depth: | 8322 ft. | True Vertical TD: | 8289 ft. | True Vertical PB depth: | 8243 ft. | Top PZ Location: | Sec:35 Twp: 2N 68W | Footage: 756 FSL 1984 FWL | Bottom Hole Location: | Sec:35 Twp: 2N 68W | Footage: 756 S 1984 W | Log Types: | CBL, ML, AILC, TRIPLE COMBO, CNLD | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 929 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 580, Top: 0 ft., Bottom: 929 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8353 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 670, Top: 4402 ft., Bottom: 8353 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4095 ft. | 4167 ft. | N | N | SUSSEX | 4542 ft. | 4838 ft. | N | N | SHANNON | 5084 ft. | 5240 ft. | N | N | NIOBRARA | 7455 ft. | | N | N | FORT HAYS | 7742 ft. | | N | N | CODELL | 7761 ft. | | N | N | J SAND | 8196 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 5/23/2018 Interval Top: 8208 ft. Interval Bottom: 8228 ft. Completed Information for Formation J SAND | 1st Production Date: | 2/22/2012 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 1/26/2012 | Treatment Summary: | "PERF AND FRAC FROM 8208-8228.
4061 BBL SLICKWATER, - 4061 BBL TOTAL FLUID
4,000# 20/40 SUPER LC, - 115,600# 40/70 OTTAWA-LG EVEREST-HENDERSON, - 115,600# TOTAL SAND."
|
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8208 ft. | # Of Holes: | 60 | Interval Bottom: | 8228 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: OW Status: CM - 3/14/2012 Interval Top: 7764 ft. Interval Bottom: 7782 ft. Completed Information for Formation CODELL | 1st Production Date: | 6/16/2009 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 5/15/2009 | Treatment Summary: | 196,938 GALS FLUID & 150,860# 40/70 SAND & 4,000# 20/40 SB EXCEL |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7764 ft. | # Of Holes: | 54 | Interval Bottom: | 7782 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 2/25/2012 Interval Top: 7460 ft. Interval Bottom: 8228 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 2/25/2012 | Treatment Summary: | No Treatment. See comments under Submit Tab. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8169 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 2/25/2012 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 2 | BTU_GAS | 1314 | CALC_BBLS_OIL | 2 | CALC_GOR | 8000 | CALC_MCF_GAS | 16 | CASING_PRESS | 1509 | GRAVITY_OIL | 50 | MCF_GAS | 16 | TUBING_PRESS | 1503 |
| Perforation Data: | Interval Top: | 7460 ft. | # Of Holes: | 177 | Interval Bottom: | 8228 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 5/23/2018 Interval Top: 7460 ft. Interval Bottom: 7782 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 6/16/2009 | Choke Size: | 0.219 in. | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/14/2009 | Treatment Summary: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 7/7/2009 | Test Method: | FLOWING | Hours Tested: | | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1236 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 47 | CALC_GOR | 3070 | CALC_MCF_GAS | 138 | CASING_PRESS | 200 | GRAVITY_OIL | 50 |
| Perforation Data: | Interval Top: | 7460 ft. | # Of Holes: | 117 | Interval Bottom: | 7782 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 3/14/2012 Interval Top: 7460 ft. Interval Bottom: 7646 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 6/16/2009 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 5/18/2009 | Treatment Summary: | 1,000 GALS ACID & 252,000 GALS FLUID & 200,980# 40/70 SAND& 4,000# 20/40 SB EXCEL |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7460 ft. | # Of Holes: | 63 | Interval Bottom: | 7646 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 05/23/2018 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|