Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-29330
Well Classification: GW Status: PA - 1/18/2019
Well Name/No:NYGREN #21-19
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date1/18/2019
FacilityID:299338LocationID:332793
County:WELD #123Location:SWNW 19 4N67W 6
Field:WATTENBERG - #90750Elevation:4957 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2059FNL  803 FWLLat/Long: 40.300810 / -104.938850Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.300817 / -104.938861Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 1/14/2019             Measured TD: 7859 ft.    Vertical TD: 7490 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 1/14/2019
Wellbore PermitDIRECTIONAL
Permit #:20085611 Expiration Date:10/27/2009
Proposed Top PZ Location:Sec:19 Twp: 4N 67W Footage: 1391 FNL  2503 FEL
Bottom Hole Location:Sec:19 Twp: 4N 67W Footage: 1391 FNL  2503 FEL
Proposed Depth/Form:7872 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA

Wellbore Completed
Completion Date:4/16/2009
Spud Date:4/12/2009Spud Date Is:ACTUAL
Measured TD:7859 ft.Measured PB depth:7811 ft.
True Vertical TD:7490 ft.True Vertical PB depth:7442 ft.
Top PZ Location:Sec:19 Twp: 4N 67WFootage: 1391 FNL  2503 FEL
Bottom Hole Location:Sec:19 Twp: 4N 67WFootage: 1391 FNL  2503 FEL
Log Types:CVL-DIL-CDL-CNL-GR-ML-SP, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1284 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 810, Top: 0 ft., Bottom: 1284 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7841 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 830, Top: 1400 ft., Bottom: 7841 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND2460 ft.NN
PARKMAN3872 ft.NN
SUSSEX4355 ft.NN
SHANNON4946 ft.NN
NIOBRARA7375 ft.NN
FORT HAYS7683 ft.NN
CODELL7703 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 9/18/2009                 Interval Top: 7705 ft.    Interval Bottom: 7723 ft.

 Completed Information for Formation CODELL
1st Production Date:8/13/2009Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/8/2009
Treatment Summary:201,222 GALS FLUID & 150,520 LBS 40/70 SAND & 4,000 LBS 20/40 R/C SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7705 ft.# Of Holes:54
Interval Bottom:7723 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 1/18/2019                 Interval Top: 7394 ft.    Interval Bottom: 7723 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:8/13/2009Choke Size:0.375 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/16/2009
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/18/2009Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1309
CALC_BBLS_H2O 0
CALC_BBLS_OIL 48
CALC_GOR 1570
CALC_MCF_GAS 75
CASING_PRESS 500
GRAVITY_OIL 50
Perforation Data:
Interval Top:7394 ft.# Of Holes:117
Interval Bottom:7723 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 9/18/2009                 Interval Top: 7394 ft.    Interval Bottom: 7573 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/13/2009Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/9/2009
Treatment Summary:1000 GALS FLUID ACID & 243,503 GALS & 200,820 LBS 40/70 SAND & 4,000 LBS 20/40 R/C SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7394 ft.# Of Holes:63
Interval Bottom:7573 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY01/18/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No