|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 1/1/2025 Measured TD: 7990 ft. Vertical TD: 7503 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 1/1/2025 | Wellbore Permit | DIRECTIONAL | Permit #: | 20085607 | Expiration Date: | 10/27/2009 | Proposed Top PZ Location: | Sec:19 Twp: 4N 67W | Footage: 1360 FSL 2491 FWL | Bottom Hole Location: | Sec:19 Twp: 4N 67W | Footage: 1360 FSL 2491 FWL | Proposed Depth/Form: | 8153 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA |
| | |
Wellbore Completed | Completion Date: | 5/15/2009 | Spud Date: | 5/10/2009 | Spud Date Is: | ACTUAL | Measured TD: | 7990 ft. | Measured PB depth: | 7946 ft. | True Vertical TD: | 7503 ft. | True Vertical PB depth: | 7459 ft. | Top PZ Location: | Sec:19 Twp: 4N 67W | Footage: 1360 FSL 2491 FWL | Bottom Hole Location: | Sec:19 Twp: 4N 67W | Footage: 1360 FSL 2491 FWL | Log Types: | P/E AILC-CNLD-ML, CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1290 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 810, Top: 0 ft., Bottom: 1290 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7982 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 850, Top: 1050 ft., Bottom: 7982 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | GREELEY SAND | 2505 ft. | 2830 ft. | N | N | PARKMAN | 3875 ft. | 4174 ft. | N | N | SUSSEX | 4420 ft. | 4650 ft. | N | N | SHANNON | 5026 ft. | 5175 ft. | N | N | NIOBRARA | 7504 ft. | | N | N | FORT HAYS | 7796 ft. | | N | N | CODELL | 7817 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 9/27/2009 Interval Top: 7819 ft. Interval Bottom: 7839 ft. Completed Information for Formation CODELL | 1st Production Date: | 8/21/2009 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/12/2009 | Treatment Summary: | 205,548 GALS FLUID & 151,000 LBS 40/70 SAND & 4,000 LBS 20/40 SB EXCEL. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7819 ft. | # Of Holes: | 60 | Interval Bottom: | 7839 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: SI - 11/1/2024 Interval Top: 7525 ft. Interval Bottom: 7839 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 8/21/2009 | Choke Size: | 0.313 in. | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 5/15/2009 | Treatment Summary: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/27/2009 | Test Method: | FLOWING | Hours Tested: | | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1279 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 24 | CALC_GOR | 1170 | CALC_MCF_GAS | 41 | CASING_PRESS | 250 | GRAVITY_OIL | 50 |
| Perforation Data: | Interval Top: | 7525 ft. | # Of Holes: | 114 | Interval Bottom: | 7839 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 9/27/2009 Interval Top: 7525 ft. Interval Bottom: 7684 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 8/21/2009 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/2/2009 | Treatment Summary: | 500 GALS ACID & 249,438 GLAS FLUID & 199,000 LBS 40/70 SAND & 4,000 LBS 20/40 SB EXCEL. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7525 ft. | # Of Holes: | 54 | Interval Bottom: | 7684 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | Y | Production Period 04/2024 - 03/2025 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 3 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.003 |
Average MCFE per Day | 0.008 |
Federal Financial Assurance | i | |
|
|