|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 5/22/2017 Measured TD: 8217 ft. Vertical TD: 8150 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 5/22/2017 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 10/7/2012 | Proposed Top PZ Location: | Sec:26 Twp: 2N 66W | Footage: 814 FSL 1850 FEL | Bottom Hole Location: | Sec:26 Twp: 2N 66W | Footage: 805 FSL 1851 FEL | Proposed Depth/Form: | 8172 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E/2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S/2SE | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1110 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 777, Top: , Bottom: 1110 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8172 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8172 ft. |
| | |
Wellbore Completed | Completion Date: | 6/2/2011 | Spud Date: | 5/28/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8217 ft. | Measured PB depth: | 8184 ft. | True Vertical TD: | 8150 ft. | True Vertical PB depth: | 8117 ft. | Top PZ Location: | Sec:26 Twp: 2N 66W | Footage: 814 FSL 1850 FEL | Bottom Hole Location: | Sec:26 Twp: 2N 66W | Footage: 805 S 1851 E | Log Types: | PRE FORM 5 | Log Types: | SD-DSN-AC-TR, CS/NG, WSPL, WAPL; CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1114 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 700, Top: 0 ft., Bottom: 1114 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8211 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 245, Top: 6510 ft., Bottom: 8211 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5770 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 695, Top: 830 ft., Bottom: 5770 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: 15 ft., Depth: 5770 ft., Bottom: 5770 ft., Sacks: 695, Method: DV TOOL | Additional Cement: | String Type: 1ST , Top: 830 ft., Depth: 5763 ft., Bottom: 5767 ft., Sacks: 695, Method: DV TOOL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4239 ft. | | | | SUSSEX | 4638 ft. | 4937 ft. | | | NIOBRARA | 7292 ft. | | | | FORT HAYS | 7580 ft. | | | | CODELL | 7602 ft. | | | | J SAND | 8058 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 5/22/2017 Interval Top: 8058 ft. Interval Bottom: 8098 ft. Completed Information for Formation J SAND | 1st Production Date: | 8/31/2011 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/29/2011 | Treatment Summary: | J S PERF 8058-8098 HOLES 66 SIZE 0.38
Frac J-Sand down 4-1/2" Csg w/ 108,830 gal Slickwater w/ 114,920# 40/70, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8058 ft. | # Of Holes: | 66 | Interval Bottom: | 8098 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 9/6/2011 Interval Top: 7360 ft. Interval Bottom: 8098 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 8/31/2011 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/29/2011 | Treatment Summary: | NB PERF 7360-7445 HOLES 66 SIZE 0.47
CD PERF 7604-7620 HOLES 64 SIZE 0.42
J S PERF 8058-8098 HOLES 66 SIZE 0.38 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8009 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/6/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 40 | BTU_GAS | 1309 | CALC_BBLS_OIL | 40 | CALC_GOR | 2500 | CALC_MCF_GAS | 100 | CASING_PRESS | 602 | GRAVITY_OIL | 46 | MCF_GAS | 100 |
| Perforation Data: | Interval Top: | 7360 ft. | # Of Holes: | 196 | Interval Bottom: | 8098 ft. | Hole Size: | 0.426 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 5/22/2017 Interval Top: 7360 ft. Interval Bottom: 7620 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 8/31/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/26/2011 | Treatment Summary: | NB PERF 7360-7445 HOLES 66 SIZE 0.47 CD PERF 7604-7620 HOLES 64 SIZE 0.42
Frac Niobrara B & C down 4-1/2" Csg w/ 244,608 gal Slickwater w/ 200,440# 40/70, 5,160# SB Excel
Frac Codell down 4-1/2" Csg w/ 203,868 gal Slickwater w/ 150,100# 40/70, 4,260# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7360 ft. | # Of Holes: | 130 | Interval Bottom: | 7620 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 05/22/2017 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|