Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-29141
Well Classification: GW Status: SI - 10/1/2025
Well Name/No:KIYOTA #4-6-35
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date10/1/2025
FacilityID:298800LocationID:336177
County:WELD #123Location:NWSE 35 3N67W 6
Field:WATTENBERG - #90750Elevation:4829 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2228FSL  1836 FELLat/Long: 40.180460 / -104.855100Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.180475 / -104.855108Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/11/2012
End Date: 1/11/2012
Reported: 8/9/2012
Prior to rule 205A.b.(2)(A)
Days to report: 211
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 10/1/2025             Measured TD: 8060 ft.    Vertical TD: 7932 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 10/1/2025
Wellbore PermitDIRECTIONAL
Permit #:20084941 Expiration Date:10/6/2009
Proposed Top PZ Location:Sec: Twp: Footage: 1328 FSL  2578 FEL
Bottom Hole Location:Sec:35 Twp: 3N 67W Footage: 1328 FSL  2578 FEL
Proposed Depth/Form:8045 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407, 407-6, Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5119 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 240, Top: 4132 ft., Bottom: 5199 ft.

Wellbore Completed
Completion Date:3/9/2009
Spud Date:3/4/2009Spud Date Is:ACTUAL
Measured TD:8060 ft.Measured PB depth:8033 ft.
True Vertical TD:7932 ft.True Vertical PB depth:7905 ft.
Top PZ Location:Sec:35 Twp: 3N 67WFootage: 1321 FSL  2526 FEL
Bottom Hole Location:Sec:35 Twp: 3N 67WFootage: 1321 FSL  2526 FEL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 789 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 385, Top: 0 ft., Bottom: 789 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8049 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 6438 ft., Bottom: 8049 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA7206 ft.NN
CODELL7456 ft.NN
J SAND7900 ft.NN

Formation JSND                     Formation Classification:  OW                     Status:  SI - 10/1/2025                 Interval Top: 7900 ft.    Interval Bottom: 7944 ft.

 Completed Information for Formation J SAND
1st Production Date:3/22/2009Choke Size: 
Formation Name:J SANDCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:1/11/2012
Treatment Summary:J Sand is plugged back to test the Codell-Niobrara. CIBP set @ 7520 on 1/11/2012.
Formation Treatment
Treatment Date:3/17/2009
Treatment Summary:JSND COMPLETION. FRAC'D THE JSND WITH 154224 GAL OF 20# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250580# SAND. 3/17/09
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7900 ft.# Of Holes:72
Interval Bottom:7944 ft.Hole Size:0.41 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 8/10/2012                 Interval Top: 7456 ft.    Interval Bottom: 7476 ft.

 Completed Information for Formation CODELL
1st Production Date:3/22/2009Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:1/11/2012
Treatment Summary:Codell Refrac Frac’d 7456’ - 7476’ with 149,576 gal frac fluid and 250,440# sand. 01-11-12
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7456 ft.# Of Holes:80
Interval Bottom:7476 ft.Hole Size:

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 4/19/2009                 Interval Top: 7240 ft.    Interval Bottom: 7944 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/9/2009
Treatment Summary:JSND-NBRR-CDL COMMINGLE. DRILLED OUT CFP'S @ 7370' AND 7550' TO COMMINGLE THE JSND-NBRR-CDL. 04/07/09
Tubing Size:2.375 in.Tubing Setting Depth:7869 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/19/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 152
BBLS_OIL 77
BTU_GAS 1282
CALC_BBLS_H2O 152
CALC_BBLS_OIL 77
CALC_GOR 8299
CALC_MCF_GAS 639
CASING_PRESS 1507
GRAVITY_OIL 53
MCF_GAS 639
TUBING_PRESS 1004
Perforation Data:
Interval Top:7240 ft.# Of Holes:192
Interval Bottom:7944 ft.Hole Size:0.41 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  SI - 10/1/2025                 Interval Top: 7240 ft.    Interval Bottom: 7476 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:3/22/2009Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:3/17/2009
Treatment Summary:NBRR-CODL RECOMPLETION. SET CFP @ 7550'. 3/17/09. FRAC'D THE CODL WITH 106218 GAL 25# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250320# 20/40 SAND. 3/17/09. SET CFP @ 7370'. 3/17/09. FRAC'D THE NBRR WITH 144522 GAL 18# VISTAR HYBRID CROSS LINKED GEL
Tubing Size:2.375 in.Tubing Setting Depth:7441 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/9/2012Test Method:Flow
Hours Tested:8Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 13
BBLS_OIL 8
BTU_GAS 1180
CALC_BBLS_H2O 39
CALC_BBLS_OIL 24
CALC_GOR 12875
CALC_MCF_GAS 309
CASING_PRESS 319
GRAVITY_OIL 54
MCF_GAS 103
TUBING_PRESS 177
Perforation Data:
Interval Top:7240 ft.# Of Holes:160
Interval Bottom:7476 ft.Hole Size:0.41 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 8/10/2012                 Interval Top: 7240 ft.    Interval Bottom: 7260 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/21/2009Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:1/11/2012
Treatment Summary:Niobrara Refrac Frac’d 7240’ - 7260’ with 131,595 gal frac fluid and 250,440# sand. 01-11-12
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7240 ft.# Of Holes:80
Interval Bottom:7260 ft.Hole Size:
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)15
GOR
GOR DeterminationMCFE
Average BOE per Day0.008
Average MCFE per Day0.042

 Federal Financial Assurance  i 

 Tribal Well  i No