|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 10/1/2021 Measured TD: 8075 ft. Vertical TD: 7991 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 10/1/2021 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20084940 | Expiration Date: | 10/6/2009 | | Proposed Top PZ Location: | Sec:35 Twp: 3N 67W | Footage: 1313 FNL 2479 FEL | | Bottom Hole Location: | Sec:35 Twp: 3N 67W | Footage: 1313 FNL 2479 FEL | | Proposed Depth/Form: | 7990 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407, 407-6, Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA |
| | |
| Wellbore Completed | | Completion Date: | 3/3/2009 | | Spud Date: | 2/26/2009 | Spud Date Is: | ACTUAL | | Measured TD: | 8075 ft. | Measured PB depth: | 8010 ft. | | True Vertical TD: | 7991 ft. | True Vertical PB depth: | 7926 ft. | | Top PZ Location: | Sec:35 Twp: 3N 67W | Footage: 1313 FNL 2479 FEL | | Bottom Hole Location: | Sec:35 Twp: 3N 67W | Footage: 1313 FNL 2479 FEL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 785 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 785 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8069 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 6450 ft., Bottom: 8069 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1600 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 287, Top: 80 ft., Bottom: 1600 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7174 ft. | | N | N | | CODELL | 7400 ft. | | N | N | | J SAND | 7842 ft. | | N | N |
Formation JSND Formation Classification: GW Status: SI - 10/1/2021 Interval Top: 7842 ft. Interval Bottom: 7886 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/12/2009 | | Treatment Summary: | JSND COMPLETION. FRAC'D THE JSND WITH 154518 GAL 20# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250980# SAND. 3/12/09 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7842 ft. | # Of Holes: | 76 | | Interval Bottom: | 7886 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: CM - 8/14/2019 Interval Top: 7402 ft. Interval Bottom: 7442 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7402 ft. | # Of Holes: | 80 | | Interval Bottom: | 7442 ft. | Hole Size: | 0.4117647 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 4/4/2009 Interval Top: 7188 ft. Interval Bottom: 7886 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/3/2009 | | Treatment Summary: | JSND-NBRR-CODL COMMINGLE. RELEASED CFP @ 7290'. SET RBP @ 7050'. 3-15-09. RELEASE RBP @ 7050'. 3/17/09 SET CBP @ 7040'. 3/18/09. RELEASED CBP @ 7040' TO COMMINGLE THE JSND-CDL. 3/19/09. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7823 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/4/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 51 | | BBLS_OIL | 50 | | BTU_GAS | 1236 | | CALC_BBLS_H2O | 51 | | CALC_BBLS_OIL | 50 | | CALC_GOR | 5140 | | CALC_MCF_GAS | 257 | | CASING_PRESS | 1202 | | GRAVITY_OIL | 52 | | MCF_GAS | 257 | | TUBING_PRESS | 513 |
| | Perforation Data: | | Interval Top: | 7188 ft. | # Of Holes: | 156 | | Interval Bottom: | 7886 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 10/1/2021 Interval Top: 7188 ft. Interval Bottom: 7422 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/12/2009 | | Treatment Summary: | NBRR-CODL RECOMPLETION. SET CFP @ 7520'. 3/12/09. FRAC'D THE CODELL WITH 109494 GAL 24# VISTAR HYBRID 250780# 20/40 SAND. 3/12/09 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/23/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 45 | | BBLS_OIL | 80 | | BTU_GAS | 1207 | | CALC_BBLS_H2O | 45 | | CALC_BBLS_OIL | 80 | | CALC_GOR | 5588 | | CALC_MCF_GAS | 447 | | GRAVITY_OIL | 54 | | MCF_GAS | 447 |
| | Perforation Data: | | Interval Top: | 7188 ft. | # Of Holes: | 120 | | Interval Bottom: | 7422 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 8/14/2019 Interval Top: 7188 ft. Interval Bottom: 7208 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7188 ft. | # Of Holes: | 40 | | Interval Bottom: | 7208 ft. | Hole Size: | 0.375 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI ) | Y | Defined Inactive 09/30/2021 |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|