|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 12/18/2017 Measured TD: 8512 ft. Vertical TD: 8416 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 12/18/2017 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 11/2/2011 | Prop Depth/Form: | 8470 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 320, Drill Unit: S2 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: S2 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 320, Drill Unit: S2 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 850 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 370, Top: 0 ft., Bottom: 850 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8470 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 320, Top: 7260 ft., Bottom: 8470 ft. | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5453 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 260, Top: 4370 ft., Bottom: 5453 ft. |
| | |
Wellbore Completed | Completion Date: | 11/27/2010 | Spud Date: | 11/22/2010 | Spud Date Is: | ACTUAL | Measured TD: | 8512 ft. | Measured PB depth: | 8456 ft. | True Vertical TD: | 8416 ft. | True Vertical PB depth: | 8360 ft. | Top PZ Location: | Sec:19 Twp: 1N 68W | Footage: 2074 FSL 595 FEL | Depth | Bottom Hole Location: | Sec:19 Twp: 1N 68W | Footage: 2093 FSL 589 FEL | Depth | Log Types: | CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1144 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 406, Top: 0 ft., Bottom: 1144 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8493 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 655, Top: 3680 ft., Bottom: 8493 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4644 ft. | | | | NIOBRARA | 7476 ft. | | | | CODELL | 7908 ft. | | | | J SAND | 8354 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 5/2/2019 Interval Top: 8354 ft. Interval Bottom: 8368 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 12/14/2010 | Treatment Summary: | J SAND COMPLETION. FRAC'D THE J-SAND WITH 153,762 GAL 18 # VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,960 # 20/40 SAND. 12/14/10. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8354 ft. | # Of Holes: | 28 | Interval Bottom: | 8368 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: OW Status: CM - 1/18/2011 Interval Top: 7476 ft. Interval Bottom: 8368 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 12/14/2010 | Treatment Summary: | JSND-CDL-NBRR COMMINGLE. SET CBP @ 7410'. 01/04/2011. DRILLED OUT CBP @ 7410', CFP @ 7870' AND 8030' TO COMMINGLE THE JSND-CDL-NBRR. 01/05/2011. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8315 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 1/18/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 80 | BBLS_OIL | 240 | BTU_GAS | 1132 | CALC_BBLS_H2O | 80 | CALC_BBLS_OIL | 240 | CALC_GOR | 1821 | CALC_MCF_GAS | 437 | CASING_PRESS | 1670 | GRAVITY_OIL | 57 | MCF_GAS | 437 | TUBING_PRESS | 868 |
| Perforation Data: | Interval Top: | 7476 ft. | # Of Holes: | 204 | Interval Bottom: | 8368 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OW Status: AB - 5/2/2019 Interval Top: 7476 ft. Interval Bottom: 7928 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 12/14/2010 | Treatment Summary: | CDL-NBRR COMPLETION. SET CFP @ 8030'. 12/14/10. FRAC'D THE CODELL WITH 107,478 GAL 22 # VBISTAR HYBRID CROSS LINKED GEL CONTAINING 250,700 # 20/40 SAND/ 12/14/10. SET CFP @ 7870'. 12-14-10. FRAC'D THE NIOBRARA WITH 131,838 GALS 18 # VISTAR HYBRID CROSS LINKED GEL CONTAINING 249,280 # 20/40 SAND. 12/14/10. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7476 ft. | # Of Holes: | 176 | Interval Bottom: | 7928 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|