|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: TA - 6/5/2025 Measured TD: 7126 ft. Vertical TD: 7039 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW TA - 6/5/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20085100 | Expiration Date: | 9/17/2009 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 1320 FSL 1280 FWL | | Bottom Hole Location: | Sec:28 Twp: 5N 64W | Footage: 1320 FSL 1280 FWL | | Proposed Depth/Form: | 7100 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407.87 , Unit Acreage: 160, Drill Unit: SW4 |
| | |
| Wellbore Completed | | Completion Date: | 11/2/2008 | | Spud Date: | 10/27/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 7126 ft. | Measured PB depth: | | | True Vertical TD: | 7039 ft. | True Vertical PB depth: | | | Top PZ Location: | Sec:28 Twp: 5N 64W | Footage: 1319 FSL 1288 FWL | | Bottom Hole Location: | Sec:28 Twp: 5N 64W | Footage: 1319 FSL 1288 FWL | | Log Types: | CD/CN/DIL; CBL GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 558 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 410, Top: 0 ft., Bottom: 558 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7087 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 695, Top: 143 ft., Bottom: 7087 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3532 ft. | | N | N | | SUSSEX | 4236 ft. | | N | N | | NIOBRARA | 6642 ft. | | N | N | | FORT HAYS | 6906 ft. | | N | N | | CODELL | 6930 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 6/5/2025 Interval Top: 6929 ft. Interval Bottom: 6945 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 11/10/2008 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/10/2008 | | Treatment Summary: | 11/10/08: 78,000# 20/40 SAND FRAC W/1702 BBLS GELLED FLUID; 12/08/08: 230,040# 20/40 SAND FRAC W/3319 BBLS GELLED FLUID |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 3 | | BBLS_OIL | 10 | | BTU_GAS | 1405 | | CALC_BBLS_H2O | 3 | | CALC_BBLS_OIL | 10 | | CALC_GOR | 7200 | | CALC_MCF_GAS | 72 | | CASING_PRESS | 620 | | GRAVITY_OIL | 54 | | MCF_GAS | 72 | | TUBING_PRESS | 560 |
| | Perforation Data: | | Interval Top: | 6929 ft. | # Of Holes: | 96 | | Interval Bottom: | 6945 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: OW Status: TA - 6/5/2025 Interval Top: 6643 ft. Interval Bottom: 6945 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 11/12/2014 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 6643 ft. | # Of Holes: | 426 | | Interval Bottom: | 6945 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 6/5/2025 Interval Top: 6643 ft. Interval Bottom: 6838 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 1/22/2011 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/21/2011 | | Treatment Summary: | Frac'd Niobrara perforations with 4264 bbls Silverstim plus 240,100# of Ottawa 30/50 sand & 24,060# of Ottawa 40/70 sand. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 29 | | BBLS_OIL | 35 | | BTU_GAS | 1405 | | CALC_BBLS_H2O | 29 | | CALC_BBLS_OIL | 35 | | CALC_GOR | 4686 | | CALC_MCF_GAS | 164 | | CASING_PRESS | 520 | | GRAVITY_OIL | 55 | | MCF_GAS | 164 | | TUBING_PRESS | 160 |
| | Perforation Data: | | Interval Top: | 6643 ft. | # Of Holes: | 330 | | Interval Bottom: | 6838 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/16/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2029 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (TA ) | Y | Defined Inactive 04/01/2025 |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|