Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-28159
Well Classification: OW Status: PA - 7/20/2023
Well Name/No:SATER #19JU
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/20/2023
FacilityID:298017LocationID:302331
County:WELD #123Location:NENW 19 4N63W 6
Field:WATTENBERG - #90750Elevation:4670 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:81FNL  1381 FWLLat/Long: 40.304640 / -104.484720Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.304630 / -104.484760Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 7/20/2023             Measured TD: 6890 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 7/20/2023
Wellbore Permit
Permit #: Expiration Date:10/22/2010
Proposed Depth/Form:7700 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA

Wellbore Completed
Completion Date:11/19/2009
Spud Date:11/15/2009Spud Date Is:ACTUAL
Measured TD:6890 ft.Measured PB depth:6806 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL, CNL/CDL, DUAL INDUCTION
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 545 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 430, Top: 0 ft., Bottom: 545 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6843 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 711, Top: 0 ft., Bottom: 6843 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 536, Top: 0 ft., Bottom: 5928 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6496 ft.NN
FORT HAYS6694 ft.NN
CODELL6717 ft.NN

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 7/20/2023                 Interval Top: 6576 ft.    Interval Bottom: 6725 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:12/15/2009Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:12/8/2009
Treatment Summary:NB- B 6516-6518 (4 HOLES), 6523-6529 (12 HOLES), CD 6719-6725 (12 HOLES). FRACD NB-CD USING 1000GALS 15% HCL, 1070BBLS SLICKWTR PAD, 717BBLS SILVERSTIM 22# PAD, 2933BBLS SILVERSTIM 22# FLUID SYSTEM, 335740 LBS 30/50 WHT SND & 16000 LBS SB EXCEL 20/40 RCP
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 12
BBLS_OIL 38
BTU_GAS 1274
CALC_BBLS_H2O 12
CALC_BBLS_OIL 38
CALC_GOR 4868
CALC_MCF_GAS 185
CASING_PRESS 653
GRAVITY_OIL 49
MCF_GAS 185
Perforation Data:
Interval Top:6576 ft.# Of Holes:28
Interval Bottom:6725 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/20/2023
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2029
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No