|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: TA - 6/14/2022 Measured TD: 8060 ft. Vertical TD: 8013 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW TA - 6/14/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/14/2012 | | Proposed Top PZ Location: | Sec:20 Twp: 4N 65W | Footage: 2511 FNL 2417 FEL | | Bottom Hole Location: | Sec:20 Twp: 4N 65W | Footage: 2511 FNL 2417 FEL | | Proposed Depth/Form: | 8060 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 732 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 292, Top: 16 ft., Bottom: 732 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8050 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 724, Top: 2750 ft., Bottom: 8050 ft. |
| | |
| Wellbore Completed | | Completion Date: | 9/13/2008 | | Spud Date: | 9/7/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 8060 ft. | Measured PB depth: | 7811 ft. | | True Vertical TD: | 8013 ft. | True Vertical PB depth: | 7746 ft. | | Top PZ Location: | Sec:20 Twp: 4N 65W | Footage: 2511 FNL 2417 FEL | | Bottom Hole Location: | Sec:20 Twp: 4N 65W | Footage: 2511 FNL 2417 FEL | | Log Types: | CBL, COMP T/COMBO, HVL, CFD/DSN, MRL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 729 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 292, Top: 0 ft., Bottom: 729 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8048 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 724, Top: 5720 ft., Bottom: 8048 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 1520 ft., Depth: 2750 ft., Bottom: 2650 ft., Sacks: 300, Method: 1 INCH | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3416 ft. | | N | N | | SUSSEX | 4590 ft. | | N | N | | NIOBRARA | 7162 ft. | | N | N | | FORT HAYS | 7442 ft. | | N | N | | CODELL | 7456 ft. | | N | N | | J SAND | 7920 ft. | | N | N |
Formation JSND Formation Classification: GW Status: TA - 6/14/2022 Interval Top: 7946 ft. Interval Bottom: 7974 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 5/19/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/27/2011 | | Treatment Summary: | Frac J-Sand down 4-1/2" Csg w/ 162,876 gal Slickwater w/ 115,000# 40/70, 4,000# SB Excel. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7946 ft. | # Of Holes: | 104 | | Interval Bottom: | 7974 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: CM - 6/14/2022 Interval Top: 7457 ft. Interval Bottom: 7472 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 10/16/2008 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/29/2008 | | Treatment Summary: | 162,372 GALS FLUID & 118,520# 20/40 SAND & 4340# 20/40 SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7457 ft. | # Of Holes: | 60 | | Interval Bottom: | 7472 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 5/18/2011 Interval Top: 7168 ft. Interval Bottom: 7974 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 5/10/2011 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/27/2011 | | Treatment Summary: | JSND RECOMPLETE |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/18/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 1 | | BTU_GAS | 1207 | | CALC_BBLS_OIL | 1 | | CALC_GOR | 231000 | | CALC_MCF_GAS | 231 | | CASING_PRESS | 40 | | GRAVITY_OIL | 63 | | MCF_GAS | 231 |
| | Perforation Data: | | Interval Top: | 7168 ft. | # Of Holes: | 232 | | Interval Bottom: | 7974 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: TA - 6/14/2022 Interval Top: 7168 ft. Interval Bottom: 7472 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 10/16/2008 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/13/2008 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BTU_GAS | 1245 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 483 | | CASING_PRESS | 1400 | | GRAVITY_OIL | 51 |
| | Perforation Data: | | Interval Top: | 7168 ft. | # Of Holes: | 180 | | Interval Bottom: | 7472 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 6/14/2022 Interval Top: 7168 ft. Interval Bottom: 7350 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 10/16/2008 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/29/2008 | | Treatment Summary: | 259,728 GALS FLUID & 379,300# 20/40 SAND & 8460# 20/40 SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7168 ft. | # Of Holes: | 120 | | Interval Bottom: | 7350 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (TA ) | Y | Defined Inactive 06/30/2020 |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|