Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-27366
Well Classification: GW Status: PA - 9/20/2021
Well Name/No:FRICO #41-14
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date9/20/2021
FacilityID:287079LocationID:332555
County:WELD #123Location:NENE 14 3N65W 6
Field:WATTENBERG - #90750Elevation:4820 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:643FNL  623 FELLat/Long: 40.230694 / -104.623164Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.230694 / -104.623164Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 9/16/2021             Measured TD: 7822 ft.    Vertical TD: 7728 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 9/16/2021
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:10/30/2010
Proposed Top PZ Location:Sec:14 Twp: 3N 65W Footage: 1250 FNL  50 FEL
Bottom Hole Location:Sec:14 Twp: 3N 65W Footage: 1253 FNL  65 FEL
Proposed Depth/Form:7820 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 700 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 308, Top: 16 ft., Bottom: 700 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7802 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 555, Top: 3490 ft., Bottom: 7802 ft.

Wellbore Completed
Completion Date:4/19/2008
Spud Date:4/15/2008Spud Date Is:ACTUAL
Measured TD:7822 ft.Measured PB depth:7769 ft.
True Vertical TD:7728 ft.True Vertical PB depth:7676 ft.
Top PZ Location:Sec:14 Twp: 3N 65WFootage: 1250 FNL  50 FEL
Bottom Hole Location:Sec:14 Twp: 3N 65WFootage: 1253 FNL  65 FEL
Log Types:CBL, P/E AILC-CNLD-ML
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 685 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 308, Top: 0 ft., Bottom: 685 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7799 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 555, Top: 3442 ft., Bottom: 7799 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3890 ft.3954 ft.NN
SUSSEX4332 ft.4636 ft.NN
NIOBRARA6926 ft.NN
FORT HAYS7183 ft.NN
CODELL7205 ft.NN
J SAND7670 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 9/20/2021                 Interval Top: 7671 ft.    Interval Bottom: 7730 ft.

 Completed Information for Formation J SAND
1st Production Date:3/24/2010Choke Size:0.000 in.
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/8/2010
Treatment Summary:FRAC W/159,348 GAL SW W/115,040# 40/70 & 4,OOO# 20/40 SUPERLC.
Tubing Size:2.375 in.Tubing Setting Depth:7656 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/31/2010Test Method:FLOWING
Hours Tested:Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1278
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 0
GRAVITY_OIL 57
Perforation Data:
Interval Top:7671 ft.# Of Holes:60
Interval Bottom:7730 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 3/31/2010                 Interval Top: 7205 ft.    Interval Bottom: 7220 ft.

 Completed Information for Formation CODELL
1st Production Date:7/16/2008Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/24/2008
Treatment Summary:166,194 GALS FLUID; 118,300 LBS 40/70 SAND; 4,960 LBS 20/40 SB EXCEL SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7205 ft.# Of Holes:60
Interval Bottom:7220 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 9/20/2021                 Interval Top: 6942 ft.    Interval Bottom: 7220 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:7/16/2008Choke Size:0.406 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/8/2010
Treatment Summary:NB PERF 6942-7086 HOLES 120 SIZE 0.42 CD PERF 7205-7220 HOLES 60 SIZE 0.38 NO ADDITIONAL TREATMENT.
Tubing Size:2.375 in.Tubing Setting Depth:7656 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/31/2010Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1278
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 10
CASING_PRESS 996
GRAVITY_OIL 57
TUBING_PRESS 211
Perforation Data:
Interval Top:6942 ft.# Of Holes:180
Interval Bottom:7220 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 3/31/2010                 Interval Top: 6942 ft.    Interval Bottom: 7086 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:7/16/2008Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/26/2008
Treatment Summary:338,688 GALS FLUID; 259,740 LBS 40/70 SAND; 8840 LBS 20/40 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6942 ft.# Of Holes:120
Interval Bottom:7086 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY09/20/2021
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No