Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-27336
Well Classification: OW Status: PA - 12/28/2023
Well Name/No:RADEMACHER #32-30
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date12/28/2023
FacilityID:287003LocationID:336313
County:WELD #123Location:NWSW 30 3N67W 6
Field:WATTENBERG - #90750Elevation:4860 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2024FSL  796 FWLLat/Long: 40.195560 / -104.938940Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.195531 / -104.938922Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 12/28/2023             Measured TD: 7500 ft.    Vertical TD: 7404 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 12/28/2023
Wellbore PermitDIRECTIONAL
Permit #:20063993 Expiration Date:9/21/2007
Proposed Top PZ Location:Sec:30 Twp: 3N 67W Footage: 2646 FSL  170 FWL
Bottom Hole Location:Sec:30 Twp: 3N 67W Footage: 2646 FSL  170 FWL
Proposed Depth/Form:7428 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 318 , Unit Acreage: 160, Drill Unit: GWA

Wellbore Completed
Completion Date:N/A
Spud Date:1/23/2007Spud Date Is:ACTUAL
Measured TD:7500 ft.Measured PB depth:7407 ft.
True Vertical TD:7404 ft.True Vertical PB depth:7311 ft.
Top PZ Location:Sec:30 Twp: 3N 67WFootage: 2646 FSL  170 FWL
Bottom Hole Location:Sec:30 Twp: 3N 67WFootage: 2645 FSL  172 FWL
Log Types:ML-CDL-CNL-CBL-IEL
Log Types:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 725 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 510, Top: 0 ft., Bottom: 725 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7441 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 515, Top: 3242 ft., Bottom: 7441 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 1500 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 210, Top: 644 ft., Bottom: 1480 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3708 ft.NN
SUSSEX4170 ft.NN
SHANNON4702 ft.NN
NIOBRARA7024 ft.NN
FORT HAYS7272 ft.NN
CODELL7294 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 11/21/2011                Interval Top: 7294 ft.    Interval Bottom: 7316 ft.

 Completed Information for Formation CODELL
1st Production Date:5/8/2007Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/27/2011
Treatment Summary:2/07/07 -CD PERF 7294-7316 HOLES 66 SIZE 0.45 12/2/10 -SET CIBP @ 7250' W/ 2 SX SAND FOR NBRR REC 1/27/11 -DRILL CIBP & PUSH TO 7394' 2/04/11 -COMMINGLE NB-CD PRODUCTION
Formation Treatment
Treatment Date:12/2/2010
Treatment Summary:Set CIBP @ 7250' w/ 2 sx sand for NB Recomplete.
Formation Treatment
Treatment Date:2/9/2007
Treatment Summary:125,838 GALS FLUID & 220,460 LBS 20/40 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 71
BTU_GAS 1283
CALC_BBLS_H2O 0
CALC_BBLS_OIL 71
CALC_GOR 2014
CALC_MCF_GAS 143
CASING_PRESS 600
GRAVITY_OIL 53
MCF_GAS 143
Perforation Data:
Interval Top:7294 ft.# Of Holes:66
Interval Bottom:7316 ft.Hole Size:0.45 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 12/28/2023                Interval Top: 7048 ft.    Interval Bottom: 7316 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:2/4/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/27/2011
Treatment Summary:2/07/07 -CD PERF 7294-7316 HOLES 66 SIZE 0.45 12/2/10 -SET CIBP @ 7250' W/ 2 SX SAND FOR NBRR REC 12/3/10 -NB PERF 7048-7177 HOLES 66 SIZE 0.38 1/27/11 -DRILL CIBP & PUSH TO 7394' 2/04/11 -COMMINGLE NB-CD PRODUCTION
Tubing Size:2.375 in.Tubing Setting Depth:7270 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/4/2011Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 7
BTU_GAS 1237
CALC_BBLS_OIL 7
CALC_GOR 6000
CALC_MCF_GAS 42
CASING_PRESS 1700
GRAVITY_OIL 49
MCF_GAS 42
TUBING_PRESS 1000
Perforation Data:
Interval Top:7048 ft.# Of Holes:132
Interval Bottom:7316 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  OG                     Status:  CM - 11/21/2011                Interval Top: 7048 ft.    Interval Bottom: 7177 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/15/2010Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/9/2010
Treatment Summary:12/3/10 -NB PERF 7048-7177 HOLES 66 SIZE 0.38 12/9/10 -Frac w/ 252 gal 15% HCl & 238,770 gal Slickwater w/ 200,260# 40/70, 4,000# SuperLC 1/27/11 -DRILL CIBP OVER CODL & PUSH TO 7394' 2/04/11 -COMMINGLE NB-CD PRODUCTION
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:SHALE
Gas Disposal:
Test TypeMeasure
BBLS_OIL 16
BTU_GAS 1255
CALC_BBLS_OIL 16
CALC_GOR 1563
CALC_MCF_GAS 25
CASING_PRESS 1550
GRAVITY_OIL 45
MCF_GAS 25
Perforation Data:
Interval Top:7048 ft.# Of Holes:66
Interval Bottom:7177 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY12/28/2023
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No