Wellbore #00 Wellbore Classification: GW Status: AB - 1/19/2024 Measured TD: 8027 ft. Vertical TD: 7953 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 1/19/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/21/2013 | | Proposed Top PZ Location: | Sec:7 Twp: 3N 65W | Footage: 2586 FSL 1339 FEL | | Bottom Hole Location: | Sec:7 Twp: 3N 65W | Footage: 2586 FSL 1339 FEL | | Proposed Depth/Form: | 8006 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 686 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 290, Top: 0 ft., Bottom: 686 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8006 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 385, Top: 6310 ft., Bottom: 8006 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5486 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 420, Top: 3700 ft., Bottom: 5486 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/4/2006 | | Spud Date: | 10/26/2006 | Spud Date Is: | ACTUAL | | Measured TD: | 8027 ft. | Measured PB depth: | 7999 ft. | | True Vertical TD: | 7953 ft. | True Vertical PB depth: | 7925 ft. | | Top PZ Location: | Sec:7 Twp: 3N 65W | Footage: 2586 FSL 1339 FEL | | Bottom Hole Location: | Sec:7 Twp: 3N 65W | Footage: 2586 FSL 1339 FEL | | Log Types: | CBL,DUAL IND/COMPENSATED DENSITY/COMPENSATED NEUTRON. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 686 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 290, Top: 0 ft., Bottom: 686 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8006 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 385, Top: 6320 ft., Bottom: 8006 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5486 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 420, Top: 3650 ft., Bottom: 5500 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4446 ft. | | N | N | | NIOBRARA | 7190 ft. | | N | N | | CODELL | 7426 ft. | | N | N | | J SAND | 7842 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 1/19/2024 Interval Top: 7856 ft. Interval Bottom: 7888 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/23/2012 | | Treatment Summary: | CIBP set at 7480’ 8/11/11 was drilled out 2/23/12
CFP set @ 7300 8/11/11 was drilled out 2/23/12
| | Formation Treatment | | Treatment Date: | 11/15/2006 | | Treatment Summary: | JSND COMPLETION / FRACD J SAND W/ 171,820 GALS FRAC FLUID & 239,040 20/40 SAND, 12,000# 20/40 SUPER LC RCS. 11/15/06 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7856 ft. | # Of Holes: | 56 | | Interval Bottom: | 7888 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: GW Status: CM - 11/6/2012 Interval Top: 7426 ft. Interval Bottom: 7446 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/11/2011 | | Treatment Summary: | CODELL - 7426 - 7446 FRAC’D W/121,359 GALS FLUID AND 250,500# SAND (08/11/2011). CIBP SET AT 7480' 08/11/2011. CFP SET @ 7300' ON 8/11/2011. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7426 ft. | # Of Holes: | 64 | | Interval Bottom: | 7446 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 3/20/2012 Interval Top: 7194 ft. Interval Bottom: 7888 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/23/2012 | | Treatment Summary: | CIBP set at 7480’ 8/11/11 was drilled out 2/23/12
CFP set @ 7300 8/11/11 was drilled out 2/23/12
| | Formation Treatment | | Treatment Date: | 11/4/2006 | | Treatment Summary: | JSND-NBRR-CDL - COMMINGLE. / DRILLED OUT CFP'S @ 7350' & 7600' TO COMMINGLE THE JSND-NIOBRARA-CODELL. 2/28/07 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7821 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/28/2012 | Test Method: | Flow | | Hours Tested: | 20 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1 | | BBLS_OIL | 4 | | BTU_GAS | 1175 | | CALC_BBLS_H2O | 1 | | CALC_BBLS_OIL | 5 | | CALC_GOR | 58000 | | CALC_MCF_GAS | 290 | | CASING_PRESS | 836 | | GRAVITY_OIL | 62 | | MCF_GAS | 242 | | TUBING_PRESS | 722 |
| | Perforation Data: | | Interval Top: | 7194 ft. | # Of Holes: | 284 | | Interval Bottom: | 7888 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 1/19/2024 Interval Top: 7194 ft. Interval Bottom: 7446 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/23/2012 | | Treatment Summary: | CIBP set at 7480’ 8/11/11 was drilled out 2/23/12
CFP set @ 7300 8/11/11 was drilled out 2/23/12
| | Formation Treatment | | Treatment Date: | 8/11/2011 | | Treatment Summary: | NIOBRARA - PERF'D 7194-7210’, 4 SPF, 64 HOLES. FRAC’D 7194-7276 W/135,811 GALS FRAC FLUID AND 250,060
# SAND (08/11/2011). CODELL - 7426 - 7446 FRAC’D W/121,359 GALS FLUID AND 250,500# SAND (08/11/2011). CIBP SET AT 7480' 08/11/2011. CFP SET @ 7300' ON 8/11/2011. | | Formation Treatment | | Treatment Date: | 11/15/2006 | | Treatment Summary: | NBRR-CDL RECOMPLETION/ SET CFP @ 7600'.FRACD CDLL W/ 107,600 GAL FLUID. 238,140# 30/50, 12,000# 20/40 SUPER LC RCS.11/15/06 // SET CFP @ 7350'. FRACD NBRR W/ 171,900 GAL FLUID, 238,080# 30/50, 12,000# 30/50 SUPER LC RCS. 11/15/06. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 9 | | BBLS_OIL | 10 | | BTU_GAS | 1175 | | CALC_BBLS_H2O | 9 | | CALC_BBLS_OIL | 10 | | CALC_GOR | 68300 | | CALC_MCF_GAS | 683 | | CASING_PRESS | 301 | | GRAVITY_OIL | 60 | | MCF_GAS | 683 |
| | Perforation Data: | | Interval Top: | 7194 ft. | # Of Holes: | 228 | | Interval Bottom: | 7446 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 11/6/2012 Interval Top: 7194 ft. Interval Bottom: 7276 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/11/2011 | | Treatment Summary: | NIOBRARA - PERF'D 7194-7210’, 4 SPF, 64 HOLES. FRAC’D 7194-7276 W/135,811 GALS FRAC FLUID AND 250,060
# SAND (08/11/2011). CIBP SET AT 7480' 08/11/2011. CFP SET @ 7300' ON 8/11/2011. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7194 ft. | # Of Holes: | 64 | | Interval Bottom: | 7276 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 01/19/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|