Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-27111
Well Classification: OW Status: PA - 9/17/2019
Well Name/No:STROH #22-22
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date9/17/2019
FacilityID:297388LocationID:310850
County:WELD #123Location:SENW 22 4N67W 6
Field:WATTENBERG - #90750Elevation:4856 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1988FNL  1985 FWLLat/Long: 40.299760 / -104.879240Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.299770 / -104.879240Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 9/17/2019             Measured TD: 7409 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 9/17/2019
Wellbore Permit
Permit #: Expiration Date:5/19/2012
Proposed Depth/Form:7430 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: S/2-NW/4
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 80, Drill Unit: S/2-NW/4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 620 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 300, Top: 0 ft., Bottom: 620 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7430 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 275, Top: 6600 ft., Bottom: 7430 ft.

Wellbore Completed
Completion Date:10/7/2010
Spud Date:10/3/2010Spud Date Is:ACTUAL
Measured TD:7409 ft.Measured PB depth:7380 ft.
True Vertical TD:True Vertical PB depth:
Log Types:GR, FDC, CNL, DIL CBL
Casing:String Type: SURF, Hole Size: 12.5 in., Size: 8.625 in., Top: 0 ft., Depth: 644 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: 644 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7395 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 655, Top: 2610 ft., Bottom: 7395 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3590 ft.3850 ft.NN
SUSSEX4185 ft.4373 ft.NN
SHANNON4620 ft.4700 ft.NN
NIOBRARA6903 ft.7195 ft.NN
FORT HAYS7195 ft.7219 ft.NN
CODELL7219 ft.7241 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 12/9/2011                 Interval Top: 7218 ft.    Interval Bottom: 7228 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/20/2010
Treatment Summary:Frac'd 7218'-7728' w/ 120,000 gal fluid and 250,000# 30/50 sand (12,000 gal slick wtr, 107,000 gal xlink gel).
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7218 ft.# Of Holes:40
Interval Bottom:7228 ft.Hole Size:0.04 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 9/17/2019                 Interval Top: 6924 ft.    Interval Bottom: 7228 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:12/22/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/29/2010Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 34
BTU_GAS 1100
CALC_BBLS_H2O 6
CALC_BBLS_OIL 34
CALC_GOR 4147
CALC_MCF_GAS 141
CASING_PRESS 920
GRAVITY_OIL 33
MCF_GAS 141
Perforation Data:
Interval Top:6924 ft.# Of Holes:192
Interval Bottom:7228 ft.Hole Size:

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 10/11/2011                Interval Top: 6924 ft.    Interval Bottom: 7110 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/20/2010
Treatment Summary:Frac'd NBRR A 6924-6930, NBRR B 6999-7005, NCRR C 7084-7110, w/ 53,820# 40/70 sand with 105,767 gals SLF, and 295,460# 30/50 sand with 96,831 gals SLF.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6924 ft.# Of Holes:152
Interval Bottom:7110 ft.Hole Size:0.04 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY09/17/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No