|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 11/15/2019 Measured TD: 8364 ft. Vertical TD: 8178 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 11/15/2019 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 7/1/2012 | Proposed Top PZ Location: | Sec:25 Twp: 2N 68W | Footage: 1944 FSL 2117 FEL | Bottom Hole Location: | Sec:25 Twp: 2N 68W | Footage: 1944 FSL 2117 FEL | Proposed Depth/Form: | 8364 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E/2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W2SE/4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 895 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 550, Top: 14 ft., Bottom: 895 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8364 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 230, Top: 5070 ft., Bottom: 8364 ft. | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5070 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 575, Top: 1535 ft., Bottom: 5070 ft. |
| | |
Wellbore Completed | Completion Date: | 8/16/2008 | Spud Date: | 8/10/2008 | Spud Date Is: | ACTUAL | Measured TD: | 8364 ft. | Measured PB depth: | 8330 ft. | True Vertical TD: | 8178 ft. | True Vertical PB depth: | 8144 ft. | Top PZ Location: | Sec:25 Twp: 2N 68W | Footage: 1944 FSL 2117 FEL | Bottom Hole Location: | Sec:25 Twp: 2N 68W | Footage: 1944 FSL 2117 FEL | Log Types: | CBL, CDL/CNL/ML, DIL/GL/GR | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 893 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 550, Top: 0 ft., Bottom: 893 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8360 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 230, Top: 5070 ft., Bottom: 8360 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5070 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 575, Top: 1535 ft., Bottom: 5070 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5070 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 575, Top: 1535 ft., Bottom: 5070 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4158 ft. | | N | N | SUSSEX | 4518 ft. | 4770 ft. | N | N | SHANNON | 5133 ft. | 5196 ft. | N | N | NIOBRARA | 7489 ft. | | N | N | FORT HAYS | 7753 ft. | | N | N | CODELL | 7774 ft. | | N | N | J SAND | 8206 ft. | | N | N |
Formation JSND Formation Classification: OG Status: AB - 11/15/2019 Interval Top: 8216 ft. Interval Bottom: 8236 ft. Completed Information for Formation J SAND | 1st Production Date: | 7/14/2011 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/21/2011 | Treatment Summary: | Frac J-Sand down 4-1/2" Csg w/ 109,788 gal Slickwater w/ 115,160# 40/70, 4,000# SuperLC, 0# . |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8216 ft. | # Of Holes: | 60 | Interval Bottom: | 8236 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: CM - 8/11/2011 Interval Top: 7776 ft. Interval Bottom: 7794 ft. Completed Information for Formation CODELL | 1st Production Date: | 12/31/2008 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/29/2008 | Treatment Summary: | 172,512 GALS FLUID & 116,120 LBS 40/70 SAND & 4,000 LBS 20/40 SB EXCEL |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7776 ft. | # Of Holes: | 54 | Interval Bottom: | 7794 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 7/24/2011 Interval Top: 7560 ft. Interval Bottom: 8236 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 7/14/2011 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/24/2011 | Treatment Summary: | J RECOMPLETE |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8171 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 7/24/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 2 | BTU_GAS | 1270 | CALC_BBLS_OIL | 2 | CASING_PRESS | 582 | GRAVITY_OIL | 51 | TUBING_PRESS | 278 |
| Perforation Data: | Interval Top: | 7560 ft. | # Of Holes: | 174 | Interval Bottom: | 8236 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 11/15/2019 Interval Top: 7560 ft. Interval Bottom: 7794 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 12/31/2008 | Choke Size: | 0.250 in. | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/16/2008 | Treatment Summary: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/5/2009 | Test Method: | FLOWING | Hours Tested: | | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1211 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 28 | CALC_GOR | 3500 | CALC_MCF_GAS | 98 | CASING_PRESS | 600 | GRAVITY_OIL | 52 |
| Perforation Data: | Interval Top: | 7560 ft. | # Of Holes: | 114 | Interval Bottom: | 7794 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 8/11/2011 Interval Top: 7560 ft. Interval Bottom: 7656 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 12/31/2008 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/30/2008 | Treatment Summary: | 1000 GALS ACID & 165,765 GALS FLUID & 250,902 LBS 20/40 SAND & 4000LBS 20/40 AC |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7560 ft. | # Of Holes: | 60 | Interval Bottom: | 7656 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 11/15/2019 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|