Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-27074
Well Classification: OW Status: PA - 9/28/2023
Well Name/No:NELSON #32-33
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date9/28/2023
FacilityID:297339LocationID:332824
County:WELD #123Location:SWNE 33 5N67W 6
Field:JOHNSTOWN - #42600Elevation:4770 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2130FNL  1966 FELLat/Long: 40.357560 / -104.895420Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.357560 / -104.895420Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 9/28/2023             Measured TD: 7112 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 9/28/2023
Wellbore Permit
Permit #:20082955 Expiration Date:7/22/2009
Proposed Depth/Form:7570 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: S2NE4
Formation And Spacing:Code: SX-SN , Formation: SUSSEX-SHANNON , Order: , Unit Acreage: 80, Drill Unit: S2NE4

Wellbore Completed
Completion Date:12/8/2008
Spud Date:12/4/2008Spud Date Is:ACTUAL
Measured TD:7112 ft.Measured PB depth:7047 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL, CNL/CDL, DUAL INDUCTION
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 588 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 420, Top: 0 ft., Bottom: 588 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7086 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 835, Top: 0 ft., Bottom: 7086 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6630 ft.NN
FORT HAYS6920 ft.NN
CODELL6940 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  AB - 9/28/2023                 Interval Top: 6946 ft.    Interval Bottom: 6954 ft.

 Completed Information for Formation CODELL
1st Production Date:1/31/2009Choke Size:0.234 in.
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/12/2009
Treatment Summary:FRAC'D CODELL WITH 645 BBLS OF VISTAR 20# PAD, 1881 BBLS OF VISTAR 20# FLUID SYSTEM, 218100 LBS OF 20/40 WHITE SAND AND 8060 LBS OF SB EXCEL 20/40 RESIN COATED PROPPANT.
Tubing Size:2.375 in.Tubing Setting Depth:6934 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/1/2009Test Method:PUMP
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 9
BTU_GAS 1165
CALC_BBLS_H2O 1
CALC_BBLS_OIL 9
CALC_GOR 5000
CALC_MCF_GAS 45
CASING_PRESS 1000
GRAVITY_OIL 49
MCF_GAS 45
TUBING_PRESS 880
Perforation Data:
Interval Top:6946 ft.# Of Holes:24
Interval Bottom:6954 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY09/28/2023
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No