Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-27074
Well Classification: OW Status: PA - 9/28/2023
Well Name/No:NELSON #32-33
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date9/28/2023
FacilityID:297339LocationID:332824
County:WELD #123Location:SWNE 33 5N67W 6
Field:JOHNSTOWN - #42600Elevation:4770 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2130FNL  1966 FELLat/Long: 40.357560 / -104.895420Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.357560 / -104.895420Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 9/28/2023             Measured TD: 7112 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 9/28/2023
Wellbore Permit
Permit #:20082955 Expiration Date:7/22/2009
Proposed Depth/Form:7570 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: S2NE4
Formation And Spacing:Code: SX-SN , Formation: SUSSEX-SHANNON , Order: , Unit Acreage: 80, Drill Unit: S2NE4

Wellbore Completed
Completion Date:12/8/2008
Spud Date:12/4/2008Spud Date Is:ACTUAL
Measured TD:7112 ft.Measured PB depth:7047 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL, CNL/CDL, DUAL INDUCTION
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 588 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 420, Top: 0 ft., Bottom: 588 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7086 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 835, Top: 0 ft., Bottom: 7086 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6630 ft.NN
FORT HAYS6920 ft.NN
CODELL6940 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  AB - 9/28/2023                 Interval Top: 6946 ft.    Interval Bottom: 6954 ft.

 Completed Information for Formation CODELL
1st Production Date:1/31/2009Choke Size:0.234 in.
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/12/2009
Treatment Summary:FRAC'D CODELL WITH 645 BBLS OF VISTAR 20# PAD, 1881 BBLS OF VISTAR 20# FLUID SYSTEM, 218100 LBS OF 20/40 WHITE SAND AND 8060 LBS OF SB EXCEL 20/40 RESIN COATED PROPPANT.
Tubing Size:2.375 in.Tubing Setting Depth:6934 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/1/2009Test Method:PUMP
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 9
BTU_GAS 1165
CALC_BBLS_H2O 1
CALC_BBLS_OIL 9
CALC_GOR 5000
CALC_MCF_GAS 45
CASING_PRESS 1000
GRAVITY_OIL 49
MCF_GAS 45
TUBING_PRESS 880
Perforation Data:
Interval Top:6946 ft.# Of Holes:24
Interval Bottom:6954 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY09/28/2023
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No