Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-26900
Well Classification: OW Status: PA - 12/13/2018
Well Name/No:TALLGRASS #15-17
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date12/13/2018
FacilityID:296777LocationID:335564
Municipality/County:ERIE / WELD #123Location:SESE 17 1N68W 6
Field:WATTENBERG - #90750Elevation:5128 ft.
Planned Location:1054FSL  1298 FELLat/Long: 40.046740 / -105.022840Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.046753 / -105.022847Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 12/13/2018             Measured TD: 8135 ft.    Vertical TD: 8044 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 12/13/2018
Wellbore PermitDIRECTIONAL
Permit #:20090572 Expiration Date:3/9/2010
Proposed Top PZ Location:Sec:17 Twp: 1N 68W Footage: 563 FSL  2118 FEL
Bottom Hole Location:Sec:17 Twp: 1N 68W Footage: 561 FSL  2123 FEL
Proposed Depth/Form:8167 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-37 , Unit Acreage: 80, Drill Unit: S17S2

Wellbore Completed
Completion Date:5/24/2009
Spud Date:5/19/2009Spud Date Is:ACTUAL
Measured TD:8135 ft.Measured PB depth:8087 ft.
True Vertical TD:8044 ft.True Vertical PB depth:7996 ft.
Top PZ Location:Sec:17 Twp: 1N 68WFootage: 563 FSL  2118 FEL
Bottom Hole Location:Sec:17 Twp: 1N 68WFootage: 561 FSL  2123 FEL
Log Types:CBL, NO OH LOGS - GAS KICK @ TD
Log Types:CBL, PNL, NO OH LOGS-GAS KICK@TD
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 990 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 770, Top: 0 ft., Bottom: 990 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8123 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 6680 ft., Bottom: 8123 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5784 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 380, Top: 2830 ft., Bottom: 5788 ft., Determination Method: CBL
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5782 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 330, Top: 2734 ft., Bottom: 5786 ft., Determination Method: CBL
Additional Cement:String Type: SURF , Top: 2830 ft., Depth: 5784 ft., Bottom: 5784 ft., Sacks: 380, Method: DV TOOL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4231 ft.
SUSSEX4716 ft.
SHANNON5321 ft.
NIOBRARA7579 ft.
FORT HAYS7950 ft.
CODELL7973 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 9/15/2010                 Interval Top: 7962 ft.    Interval Bottom: 7978 ft.

 Completed Information for Formation CODELL
1st Production Date:8/26/2009Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/16/2009
Treatment Summary:FRAC CODL W/204,777 GAL SW & 151,900# 40/70 SAND & 4,000# 20/40 SB EXCEL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7962 ft.# Of Holes:64
Interval Bottom:7978 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 12/13/2018                Interval Top: 7566 ft.    Interval Bottom: 7978 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:8/26/2009Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/19/2010
Treatment Summary:NBRR PERF 7566-7830 HOLES 66 SIZE 0.42 CODL PERF 7960-7978 HOLES 64 SIZE 0.38
Tubing Size:2.375 in.Tubing Setting Depth:7941 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/19/2010Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 23
BTU_GAS 1305
CALC_BBLS_OIL 23
CALC_GOR 6261
CALC_MCF_GAS 144
CASING_PRESS 519
GRAVITY_OIL 49
MCF_GAS 144
TUBING_PRESS 369
Perforation Data:
Interval Top:7566 ft.# Of Holes:130
Interval Bottom:7978 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 9/15/2010                 Interval Top: 7566 ft.    Interval Bottom: 7830 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/26/2009Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/16/2009
Treatment Summary:FRAC NBRR W/219,505 GAL SW & 153,120# 40/70 SAND & 4,00# 20/40 SB EXCEL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7566 ft.# Of Holes:66
Interval Bottom:7830 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY12/13/2018
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
April 2024 - March 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No