|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 9/28/2021 Measured TD: 7930 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 9/28/2021 | | Wellbore Permit | | | Permit #: | 20082148 | Expiration Date: | 6/23/2009 | | Proposed Depth/Form: | 7985 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S/2SE |
| | |
| Wellbore Completed | | Completion Date: | 11/7/2008 | | Spud Date: | 11/2/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 7930 ft. | Measured PB depth: | 7895 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | SBL, CDL/CNL/ML, DIL/GL/GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 679 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 430, Top: 0 ft., Bottom: 679 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7925 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 730, Top: 3190 ft., Bottom: 7925 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4028 ft. | | N | N | | SUSSEX | 4502 ft. | | N | N | | SHANNON | 5040 ft. | | N | N | | NIOBRARA | 7421 ft. | | N | N | | FORT HAYS | 7752 ft. | | N | N | | CODELL | 7774 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 5/10/2012 Interval Top: 7774 ft. Interval Bottom: 7794 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 2/17/2009 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/4/2012 | | Treatment Summary: | CD PERF 7774-7794 HOLES 60 SIZE 0.38
4/4/12 -Refrac NB-CD down 4.5" casing w/ 264,096 gal slickwater. No proppant used on this job. Break not observed. ATP=4,680 psi; MTP=5,574 psi; ATR=59.6 bpm; ISDP=2,756 psi
4/25/12 -RWTP UP TBG AFTER CD RF | | Formation Treatment | | Treatment Date: | 11/18/2008 | | Treatment Summary: | 167,000 GALS FLUID & 116,000 LBS 40/70 SAND & 4000 LBS 20/40 SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7774 ft. | # Of Holes: | 60 | | Interval Bottom: | 7794 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 9/30/2021 Interval Top: 7422 ft. Interval Bottom: 7794 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 2/17/2009 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/4/2012 | | Treatment Summary: | NB PERF 7422-7662 HOLES 114 SIZE 0.41
CD PERF 7774-7794 HOLES 60 SIZE 0.38
4/4/12 -REFRAC CODELL
4/25/12 -RWTP UP TBG AFTER CD RF | | Formation Treatment | | Treatment Date: | 11/7/2008 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7753 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/3/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 8 | | BTU_GAS | 1192 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 8 | | CALC_GOR | 5000 | | CALC_MCF_GAS | 40 | | CASING_PRESS | 1265 | | GRAVITY_OIL | 50 | | MCF_GAS | 40 | | TUBING_PRESS | 630 |
| | Perforation Data: | | Interval Top: | 7422 ft. | # Of Holes: | 174 | | Interval Bottom: | 7794 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 5/25/2009 Interval Top: 7422 ft. Interval Bottom: 7662 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 2/17/2009 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/19/2008 | | Treatment Summary: | 1000 GALS ACID & 404,000 GALS FLUID & 291,000 LBS 40/70 SAND & 8,000 20/40 SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7422 ft. | # Of Holes: | 114 | | Interval Bottom: | 7662 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 09/30/2021 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|