|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 11/22/2019 Measured TD: 8433 ft. Vertical TD: 8334 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 11/22/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/10/2012 | | Proposed Top PZ Location: | Sec:6 Twp: 1N 68W | Footage: 1327 FSL 77 FEL | | Bottom Hole Location: | Sec:6 Twp: 1N 68W | Footage: 1347 FSL 82 FEL | | Proposed Depth/Form: | 8433 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 683 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 430, Top: 0 ft., Bottom: 683 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8421 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 805, Top: 3590 ft., Bottom: 8421 ft. |
| | |
| Wellbore Completed | | Completion Date: | 9/17/2008 | | Spud Date: | 9/11/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 8433 ft. | Measured PB depth: | 8391 ft. | | True Vertical TD: | 8334 ft. | True Vertical PB depth: | 8292 ft. | | Top PZ Location: | Sec:6 Twp: 1N 68W | Footage: 1327 FSL 77 FEL | | Bottom Hole Location: | Sec:6 Twp: 1N 68W | Footage: 1327 FSL 77 FEL | | Log Types: | CDL-GR-CAL-CNL-DIL-ML | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 683 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 430, Top: 0 ft., Bottom: 683 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8421 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 805, Top: 3590 ft., Bottom: 8421 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4105 ft. | | N | N | | SUSSEX | 4528 ft. | | N | N | | SHANNON | 5122 ft. | | N | N | | NIOBRARA | 7495 ft. | | N | N | | FORT HAYS | 7816 ft. | | N | N | | CODELL | 7837 ft. | | N | N | | J SAND | 8270 ft. | | N | N |
Formation JSND Formation Classification: OW Status: AB - 12/19/2019 Interval Top: 8280 ft. Interval Bottom: 8298 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 3/30/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/16/2011 | | Treatment Summary: | Frac J-Sand down 4-1/2" Csg w/ 155,400 gal Slickwater w/ 115,980# 40/70. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8280 ft. | # Of Holes: | 54 | | Interval Bottom: | 8298 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: OW Status: CM - 6/9/2011 Interval Top: 7838 ft. Interval Bottom: 7854 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/25/2009 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/7/2008 | | Treatment Summary: | 170,000 GAL FLUID & 116,000 LBS 30/50 SAND & 4000 LBS 20/40 R/C SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7838 ft. | # Of Holes: | 64 | | Interval Bottom: | 7854 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 4/19/2011 Interval Top: 7494 ft. Interval Bottom: 8298 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 3/30/2011 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/16/2011 | | Treatment Summary: | JSND RECOMPLETE |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/19/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 8 | | BTU_GAS | 1330 | | CALC_BBLS_OIL | 8 | | CALC_GOR | 67375 | | CALC_MCF_GAS | 539 | | CASING_PRESS | 1004 | | GRAVITY_OIL | 50 | | MCF_GAS | 539 |
| | Perforation Data: | | Interval Top: | 7494 ft. | # Of Holes: | 193 | | Interval Bottom: | 8298 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 12/19/2019 Interval Top: 7494 ft. Interval Bottom: 7854 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/25/2009 | Choke Size: | 0.281 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/17/2008 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/10/2009 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1280 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 45 | | CALC_GOR | 3830 | | CALC_MCF_GAS | 172 | | CASING_PRESS | 226 | | GRAVITY_OIL | 51 |
| | Perforation Data: | | Interval Top: | 7494 ft. | # Of Holes: | 133 | | Interval Bottom: | 7854 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 6/9/2011 Interval Top: 7494 ft. Interval Bottom: 7722 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/25/2009 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/9/2008 | | Treatment Summary: | 1000 GALS ACID & 258,000 GALS FLUID & 202,000 LBS 30/50 SAND & 4000 LBS 20/40 R/C SAND,
1000 GALS ACID & 258,000 GALS FLUID & 202,000 LBS 30/50 SAND & 4,000 20/40 R/C SAND.
|
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7494 ft. | # Of Holes: | 69 | | Interval Bottom: | 7722 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 12/19/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|