Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-26883
Well Classification: OW Status: PA - 11/28/2022
Well Name/No:BULTHAUP #21-6
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date11/28/2022
FacilityID:296724LocationID:336520
Municipality/County:ERIE / WELD #123Location:SWNE 6 1N68W 6
Field:SPINDLE - #77900Elevation:4972 ft.
Planned Location:1995FNL  2080 FELLat/Long: 40.082200 / -105.044520Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.082199 / -105.044525Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 11/28/2022             Measured TD: 7879 ft.    Vertical TD: 7783 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 11/28/2022
Wellbore PermitDIRECTIONAL
Permit #:20082476 Expiration Date:6/23/2009
Prop Depth/Form:7861 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA

Wellbore Completed
Completion Date:N/A
Spud Date:10/27/2008Spud Date Is:ACTUAL
Measured TD:7879 ft.Measured PB depth:7840 ft.
True Vertical TD:7783 ft.True Vertical PB depth:7744 ft.
Top PZ Location:Sec:6 Twp: 1N 68WFootage: 1291 FNL  2518 FEL
Bottom Hole Location:Sec:6 Twp: 1N 68WFootage: 1283 FNL  2520 FEL
Log Types:SBL, CDL/CNL/ML, DIL/GL/GR
Log Types:
Log Types:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 815 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 0 ft., Bottom: 915 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7853 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 661, Top: 3690 ft., Bottom: 7853 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 3690 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 445, Top: 970 ft., Bottom: 3690 ft., Determination Method: CBL
Casing:String Type: S.C. 1.2, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 950 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 199, Top: 100 ft., Bottom: 950 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4062 ft.NN
SUSSEX4396 ft.NN
SHANNON4996 ft.NN
NIOBRARA7394 ft.NN
FORT HAYS7706 ft.NN
CODELL7728 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 5/14/2009                 Interval Top: 7728 ft.    Interval Bottom: 7748 ft.

 Completed Information for Formation CODELL
1st Production Date:3/25/2009Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/11/2008
Treatment Summary:182440 GALS FLUID & 122263 LBS 40/70 SAND & 4000 LBS 20/40 R/C SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7728 ft.# Of Holes:60
Interval Bottom:7748 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 11/28/2022                Interval Top: 7392 ft.    Interval Bottom: 7748 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:3/25/2009Choke Size:0.250 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/1/2008
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/14/2009Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1281
CALC_BBLS_H2O 0
CALC_BBLS_OIL 17
CALC_GOR 9000
CALC_MCF_GAS 153
CASING_PRESS 100
GRAVITY_OIL 51
Perforation Data:
Interval Top:7392 ft.# Of Holes:114
Interval Bottom:7748 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 5/14/2009                 Interval Top: 7392 ft.    Interval Bottom: 7606 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/25/2009Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/14/2008
Treatment Summary:167806 GALS FRAC FLUID & 250860 LBS 20/40 SAND & 4000 LBS 20/40 R/C SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7392 ft.# Of Holes:54
Interval Bottom:7606 ft.Hole Size:0.41 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedYCut and Cap Date
11/28/2022
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2023 - October 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No