|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 7/19/2024 Measured TD: 6920 ft. Vertical TD: 6920 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 7/19/2024 | Wellbore Permit | DRIFTED | Permit #: | 20082206 | Expiration Date: | 6/15/2009 | Proposed Depth/Form: | 6930 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: E/2SE | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 80, Drill Unit: E/2SE |
| | |
Wellbore Completed | Completion Date: | 7/6/2008 | Spud Date: | 7/4/2008 | Spud Date Is: | ACTUAL | Measured TD: | 6920 ft. | Measured PB depth: | 6892 ft. | True Vertical TD: | 6920 ft. | True Vertical PB depth: | 6892 ft. | Log Types: | CBL/GR/CCL, CDL/CN/ML, DIL/GR | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 568 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 274, Top: 0 ft., Bottom: 568 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6912 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 750, Top: 1450 ft., Bottom: 6912 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 6461 ft. | | N | N | FORT HAYS | 6747 ft. | | N | N | GREENHORN | 6747 ft. | | N | N | CODELL | 6771 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 10/25/2019 Interval Top: 6772 ft. Interval Bottom: 6782 ft. Completed Information for Formation CODELL | 1st Production Date: | 8/22/2008 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 11/19/2019 | Treatment End Date: | N/A | Treatment Summary: | 11/22/2008: CIFTP at 6658' removed | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: | Formation Treatment | Treatment Date: | 8/12/2008 | Treatment Summary: | CODL FRAC'D W/ 1,008 GALS 15% HCI ACID; 170,898 GALS SILVERSTIM; 3,486 GALS SLICKWATER & 279,271# 20/40 OTTOWA SAND. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 6772 ft. | # Of Holes: | 40 | Interval Bottom: | 6782 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 7/19/2024 Interval Top: 6495 ft. Interval Bottom: 6782 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 8/22/2008 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/12/2008 | Treatment Summary: | COMMINGLE NIOBRARA & CODELL. CODELL PRODUCING THROUGH CAST IRON FLOW PLUG. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 11 | BBLS_OIL | 60 | BTU_GAS | 1212 | CALC_BBLS_H2O | 11 | CALC_BBLS_OIL | 60 | CALC_GOR | 2400 | CALC_MCF_GAS | 144 | CASING_PRESS | 380 | GRAVITY_OIL | 57 | MCF_GAS | 144 |
| Perforation Data: | Interval Top: | 6495 ft. | # Of Holes: | 168 | Interval Bottom: | 6782 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 10/25/2019 Interval Top: 6495 ft. Interval Bottom: 6609 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 8/22/2008 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/12/2008 | Treatment Summary: | NBRR FRAC'D W/ 118,440 GALS SILVERSTIM; 70,056 GALS SLICKWATER & 258,385# 20/40 OTTAWA SAND. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 6495 ft. | # Of Holes: | 128 | Interval Bottom: | 6609 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 07/19/2024 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|