|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 4/12/2023 Measured TD: 7821 ft. Vertical TD: 7818 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 4/12/2023 | | Wellbore Permit | DRIFTED | | Permit #: | 20082158 | Expiration Date: | 6/9/2009 | | Proposed Depth/Form: | 7780 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | STATE | Surface Owner: | STATE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA |
| | |
| Wellbore Completed | | Completion Date: | 8/6/2008 | | Spud Date: | 8/2/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 7821 ft. | Measured PB depth: | 7796 ft. | | True Vertical TD: | 7818 ft. | True Vertical PB depth: | 7793 ft. | | Log Types: | CBL/GR/CCL, CDL/CN/ML, DIL/GR | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 635 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 338, Top: 0 ft., Bottom: 635 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7812 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 870, Top: 1690 ft., Bottom: 7812 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 1298 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 205, Top: 446 ft., Bottom: 1298 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3808 ft. | | N | N | | SUSSEX | 4427 ft. | | N | N | | SHANNON | 5067 ft. | | N | N | | TEEPEE BUTTES | 6084 ft. | | N | N | | NIOBRARA | 6904 ft. | | N | N | | FORT HAYS | 7187 ft. | | N | N | | CODELL | 7211 ft. | | N | N | | D SAND | 7599 ft. | | N | N | | MOWRY | 7650 ft. | | N | N | | J SAND | 7666 ft. | | N | N |
Formation JSND Formation Classification: OW Status: AB - 4/12/2023 Interval Top: 7666 ft. Interval Bottom: 7714 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 9/24/2008 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/23/2008 | | Treatment Summary: | JSND FRAC'D W/ 159,001 GALS SILVERSTIM; 6,110 GALS SLICKWATER; 426,620# 20/40 OTTAWA SAND & 12,271# SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7666 ft. | # Of Holes: | 120 | | Interval Bottom: | 7714 ft. | Hole Size: | 0.41 in. |
|
Formation CODL Formation Classification: OW Status: CM - 9/24/2008 Interval Top: 7212 ft. Interval Bottom: 7226 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 9/24/2008 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/23/2008 | | Treatment Summary: | CODL FRAC'D W/ 1,032 GALS 15% HCI AVID; 140,457 GALS SILVERSTIM; 3,872 GALS SLICKWATER & 265,886# 20/40 OTTAWA SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7212 ft. | # Of Holes: | 56 | | Interval Bottom: | 7226 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 10/10/2008 Interval Top: 6934 ft. Interval Bottom: 7714 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 9/24/2008 | Choke Size: | 0.188 in. | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/6/2008 | | Treatment Summary: | COMMINGLE THE NIOBRARA, CODELL & J SAND. CODELL & J SAND PRODUCING THROUGH CAST IRON FLOW PLUGS. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/10/2008 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 6 | | BBLS_OIL | 44 | | BTU_GAS | 1218 | | CALC_BBLS_H2O | 6 | | CALC_BBLS_OIL | 44 | | CALC_GOR | 13068 | | CALC_MCF_GAS | 575 | | CASING_PRESS | 800 | | GRAVITY_OIL | 56 | | MCF_GAS | 575 |
| | Perforation Data: | | Interval Top: | 6934 ft. | # Of Holes: | 240 | | Interval Bottom: | 7714 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 9/24/2008 Interval Top: 6934 ft. Interval Bottom: 6996 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 9/24/2008 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/23/2008 | | Treatment Summary: | NBRR FRAC'D W/ 113,089 GALS SILVERSTIM; 74,494 GALS SLICKWATER; & 258,209# 20/40 OTTAWA SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6934 ft. | # Of Holes: | 64 | | Interval Bottom: | 6996 ft. | Hole Size: | 0.73 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 4/12/2023| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 9/24/2008 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | No Perforation Data was found for formation NB-CD. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/12/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|