|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 5/25/2023 Measured TD: 7789 ft. Vertical TD: 7789 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 5/25/2023 | Wellbore Permit | | Permit #: | 20082184 | Expiration Date: | 6/9/2009 | Proposed Depth/Form: | 7820 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | STATE | Surface Owner: | STATE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: W/2 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA |
| | |
Wellbore Completed | Completion Date: | 7/12/2008 | Spud Date: | 7/8/2008 | Spud Date Is: | ACTUAL | Measured TD: | 7789 ft. | Measured PB depth: | 7755 ft. | True Vertical TD: | 7789 ft. | True Vertical PB depth: | 7755 ft. | Log Types: | CBL/GR/CCL, CDL/CN/ML, DIL/R | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 651 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 346, Top: 0 ft., Bottom: 651 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7775 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 850, Top: 1630 ft., Bottom: 7775 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3815 ft. | | N | N | SUSSEX | 4402 ft. | | N | N | SHANNON | 5192 ft. | | N | N | TEEPEE BUTTES | 6102 ft. | | N | N | NIOBRARA | 6888 ft. | | N | N | FORT HAYS | 7168 ft. | | N | N | CODELL | 7190 ft. | | N | N | D SAND | 7584 ft. | | N | N | MOWRY | 7630 ft. | | N | N | J SAND | 7644 ft. | | N | N |
Formation JSND Formation Classification: OW Status: AB - 5/30/2023 Interval Top: 7647 ft. Interval Bottom: 7692 ft. Completed Information for Formation J SAND | 1st Production Date: | 8/20/2008 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/14/2008 | Treatment Summary: | JSND FRAC'D W/167,202 GALS 15% HCI ACID, SILVERSTIM & SLICKWATER; 428,464# 20/40 OTTAWA SAND & 18,000# SB EXCEL. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 7647 ft. | # Of Holes: | 92 | Interval Bottom: | 7692 ft. | Hole Size: | 0.41 in. |
|
Formation CODL Formation Classification: OW Status: CM - 8/20/2008 Interval Top: 7191 ft. Interval Bottom: 7205 ft. Completed Information for Formation CODELL | 1st Production Date: | 8/20/2008 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/14/2008 | Treatment Summary: | CODL FRAC'D W/1,000 GAL 15% HCI ACID; 140,952 GALS SILVERSTIM & 3830 GAL SLICKWATER & 270,000# 20/40 SAND. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7191 ft. | # Of Holes: | 56 | Interval Bottom: | 7205 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 9/5/2008 Interval Top: 6920 ft. Interval Bottom: 7692 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 8/20/2008 | Choke Size: | 0.156 in. | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/12/2008 | Treatment Summary: | COMMINGLE THE JSND, NBRR, & CODL. CODELL & JSND PRODUCING THROUGH CAST IRON FLOW PLUGS. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/5/2008 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 8 | BBLS_OIL | 50 | BTU_GAS | 1221 | CALC_BBLS_H2O | 8 | CALC_BBLS_OIL | 50 | CALC_GOR | 14960 | CALC_MCF_GAS | 748 | CASING_PRESS | 800 | GRAVITY_OIL | 60 | MCF_GAS | 748 |
| Perforation Data: | Interval Top: | 6920 ft. | # Of Holes: | 276 | Interval Bottom: | 7692 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 8/20/2008 Interval Top: 6920 ft. Interval Bottom: 6984 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 8/20/2008 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/14/2008 | Treatment Summary: | NBRR FRAC'D W/1,000 GALS 15% HCI ACID; 186,236 GALS SILVERSTIM & SLICKWATER & 251,000# 20/40 OTTAWA SAND. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 6920 ft. | # Of Holes: | 128 | Interval Bottom: | 6984 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 5/30/2023 Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 8/20/2008 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| No Perforation Data was found for formation NB-CD. |
|
|
|
|
|
Reported Plugged | Y | 05/30/2023 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2029 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|