|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 4/3/2023 Measured TD: 7563 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 4/3/2023 | | Wellbore Permit | | | Permit #: | 20081846 | Expiration Date: | 6/4/2009 | | Proposed Depth/Form: | 7960 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: S2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 80, Drill Unit: W2SW4 | | Formation And Spacing: | Code: SX-SN , Formation: SUSSEX-SHANNON , Order: , Unit Acreage: 80, Drill Unit: W2SW4 | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: PLANNED | | Cement: | Sacks: 450, Top: 0 ft., Bottom: 6260 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/16/2008 | | Spud Date: | 12/9/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 7563 ft. | Measured PB depth: | 7463 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL, CNL/CDL, DUAL INDUCTION | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 866 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 610, Top: 0 ft., Bottom: 866 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7503 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 790, Top: 1300 ft., Bottom: 7503 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7030 ft. | | N | N | | FORT HAYS | 7298 ft. | | N | N | | CODELL | 7319 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 9/30/2010 Interval Top: 7324 ft. Interval Bottom: 7332 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/9/2009 | | Treatment Summary: | FRAC'D CODELL WITH 643 BBLS OF SILVERSTIM 22# PAD, 1968 BBLS OF SILVERSTIM 22# FLUID SYSTEM, 218260 LBS OF 20/40 WHITE SAND AND 8000 LBS OF SB EXCEL 20/40 RESIN COATED PROPPANT. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7324 ft. | # Of Holes: | 24 | | Interval Bottom: | 7332 ft. | Hole Size: | 0.34 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 12/14/2022 Interval Top: 7034 ft. Interval Bottom: 7332 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 2/23/2009 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/16/2008 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 4 | | BBLS_OIL | 29 | | BTU_GAS | 1317 | | CALC_BBLS_H2O | 4 | | CALC_BBLS_OIL | 29 | | CALC_GOR | 1172 | | CALC_MCF_GAS | 34 | | CASING_PRESS | 1400 | | GRAVITY_OIL | 45 | | MCF_GAS | 34 | | TUBING_PRESS | 1000 |
| | Perforation Data: | | Interval Top: | 7034 ft. | # Of Holes: | 52 | | Interval Bottom: | 7332 ft. | Hole Size: | 0.34 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 9/30/2010 Interval Top: 7034 ft. Interval Bottom: 7166 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/16/2009 | | Treatment Summary: | PERF NIOBRARA "A" 7034'-7036' (4 HOLES), NIOBRARA "B" 7158'-7166' (24 HOLES). FRAC'D NIOBRARA WITH 500 GALS OF 15% HCL, 502 BBLS SLICKWATER PAD, 400 BBLS OF SILVERSTIM 22# PAD, 2318 BBLS OF SILVERSTIM 22# FLUID SYSTEM, 238740 LBS OF |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7034 ft. | # Of Holes: | 28 | | Interval Bottom: | 7166 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/03/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | Y | Noticed Date 12/08/2022 |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|