Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-26364
Well Classification: OW Status: PA - 2/9/2021
Well Name/No:DACONO STATE #22-36
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:72/2841S
Facility Status:PAStatus Date2/9/2021
FacilityID:292472LocationID:336215
Municipality/County:FREDERICK / WELD #123Location:SENW 36 2N68W 6
Field:WATTENBERG - #90750Elevation:5025 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2062FNL  2002 FWLLat/Long: 40.096610 / -104.953940Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.096614 / -104.953917Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/12/2013
End Date: 9/12/2013
Reported: 10/30/2013
Days to report: 48
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 2/9/2021             Measured TD: 7960 ft.    Vertical TD: 7886 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 2/9/2021
Wellbore PermitDIRECTIONAL
Permit #:20081379 Expiration Date:4/20/2009
Proposed Top PZ Location:Sec:36 Twp: 2N 68W Footage: 2577 FNL  1373 FWL
Bottom Hole Location:Sec:36 Twp: 2N 68W Footage: 2577 FNL  1373 FWL
Proposed Depth/Form:7940 ft.
Surface Mineral Owner Same:No
Mineral Owner:STATESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA

Wellbore Completed
Completion Date:10/30/2008
Spud Date:10/25/2008Spud Date Is:ACTUAL
Measured TD:7960 ft.Measured PB depth:7914 ft.
True Vertical TD:7886 ft.True Vertical PB depth:7840 ft.
Top PZ Location:Sec:36 Twp: 2N 68WFootage: 2577 FNL  1373 FWL
Bottom Hole Location:Sec:36 Twp: 2N 68WFootage: 2577 FNL  1373 FWL
Log Types:CBL, DIL/GL/GR, CDL/CNL/ML
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 901 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 590, Top: 0 ft., Bottom: 901 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7944 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 703, Top: 2450 ft., Bottom: 7944 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4166 ft.NN
SUSSEX4612 ft.NN
SHANNON5156 ft.NN
TEEPEE BUTTES7164 ft.NN
NIOBRARA7475 ft.NN
FORT HAYS7755 ft.NN
CODELL7777 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 11/13/2013                Interval Top: 7780 ft.    Interval Bottom: 7800 ft.

 Completed Information for Formation CODELL
1st Production Date:11/25/2008Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/9/2013Treatment End Date:9/9/2013
Treatment Summary:CODELL REFRAC 4911 BBL SLICKWATER, 4911 BBL TOTAL FLUID. 165140# 40/70 SAND, 4000 20/40 SAND, 169140# TOTAL SAND.
Total fluid used in treatment (bbls):4911Max pressure during treatment (psi):4980
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.84
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):40
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):169140Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:11/13/2008
Treatment Summary:173,217 GALS FLUID & 115,920# 40/70 SAND & 4000# 20/40 SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7780 ft.# Of Holes:60
Interval Bottom:7800 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 2/9/2021                  Interval Top: 7558 ft.    Interval Bottom: 7800 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/30/2008
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 8
BTU_GAS 1378
CALC_BBLS_H2O 0
CALC_BBLS_OIL 8
CALC_GOR 7375
CALC_MCF_GAS 59
CASING_PRESS 963
GRAVITY_OIL 43
MCF_GAS 59
TUBING_PRESS 865
Perforation Data:
Interval Top:7558 ft.# Of Holes:120
Interval Bottom:7800 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 1/21/2009                 Interval Top: 7558 ft.    Interval Bottom: 7646 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/25/2008Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/13/2008
Treatment Summary:500 GALS ACID & 211,613 GALS FLUID & 153,180# 40/70 SAND & 4000# 20/40 SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7558 ft.# Of Holes:60
Interval Bottom:7646 ft.Hole Size:0.41 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY02/09/2021
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No