Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-26279
Well Classification: OW Status: PA - 7/19/2022
Well Name/No:GUTTERSEN #31-13
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/19/2022
FacilityID:292275LocationID:310346
County:WELD #123Location:NWNE 13 3N64W 6
Field:WATTENBERG - #90750Elevation:4740 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:664FNL  1973 FELLat/Long: 40.230720 / -104.497220Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.230734 / -104.497236Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/19/2012
End Date: 7/19/2012
Reported: 6/25/2013
Originally Reported: 11/6/2012
Days to report: 341
Days to report: 110
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 7/19/2022             Measured TD: 7740 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 7/19/2022
Wellbore Permit
Permit #:20073907 Expiration Date:9/16/2008
Proposed Depth/Form:7625 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: DKTA , Formation: DAKOTA , Order: 499-15 , Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: W2NE
Formation And Spacing:Code: SX-SN , Formation: SUSSEX-SHANNON , Order: , Unit Acreage: 80, Drill Unit: W2NE
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4700 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 125, Top: 3950 ft., Bottom: 4700 ft.

Wellbore Completed
Completion Date:N/A
Spud Date:11/25/2007Spud Date Is:ACTUAL
Measured TD:7740 ft.Measured PB depth:7670 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL, CNL/CDL, DUAL INDUCTION
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 661 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 470, Top: 0 ft., Bottom: 661 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7724 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 650, Top: 3024 ft., Bottom: 7724 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 3024 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 645, Top: 100 ft., Bottom: 3024 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6527 ft.NN
FORT HAYS6775 ft.NN
CODELL6798 ft.NN
J SAND7258 ft.NN
DAKOTA7476 ft.NN
LAKOTA7550 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 5/21/2013                 Interval Top: 6800 ft.    Interval Bottom: 6808 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:6800 ft.# Of Holes:24
Interval Bottom:6808 ft.Hole Size:

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 7/19/2022                 Interval Top: 6531 ft.    Interval Bottom: 6808 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:8/28/2008
Treatment Summary:NOBRARA 6586'-6592' (18 HOLES) AND CODELL 6801'-6807' (18 HOLES) FRAC'D NIOBRARA/CODELL WITH 24 BBLS OF 15% HCL, 1062 BBLS OF SLICKWATER PAD, 959 BBLS OF VISTAR 20# PAD, --SEE OPERATORS COMMENTS
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 1
BTU_GAS 1330
CALC_BBLS_H2O 1
CALC_BBLS_OIL 1
CALC_GOR 13
CALC_MCF_GAS 13
CASING_PRESS 471
GRAVITY_OIL 47
MCF_GAS 13
TUBING_PRESS 417
Perforation Data:
Interval Top:6531 ft.# Of Holes:52
Interval Bottom:6808 ft.Hole Size:0.34 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 5/21/2013                 Interval Top: 6531 ft.    Interval Bottom: 6592 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/20/2012Treatment End Date:7/20/2012
Treatment Summary:Nio Bench "A" 6531-6533 Nio Bench "B" 6581-6589
Total fluid used in treatment (bbls):4065Max pressure during treatment (psi):4883
Total gas used in treatment (mcf):Fluid density (lbs/gal):20.00
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):24Min frac gradient (psi/ft):0.94
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):4041Disposition method For flowback:DISPOSAL
Total proppant used (lbs):251050Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6531 ft.# Of Holes:64
Interval Bottom:6592 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/19/2022
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No