Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-26276
Well Classification: OW Status: PA - 7/19/2022
Well Name/No:GUTTERSEN #32-13
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/19/2022
FacilityID:292278LocationID:310343
County:WELD #123Location:SWNE 13 3N64W 6
Field:WATTENBERG - #90750Elevation:4750 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1887FNL  1850 FELLat/Long: 40.227390 / -104.496810Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.227379 / -104.496821Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 7/19/2022             Measured TD: 7714 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 7/19/2022
Wellbore Permit
Permit #:20073908 Expiration Date:9/16/2008
Proposed Depth/Form:7625 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: DKTA , Formation: DAKOTA , Order: 499-15 , Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: W2NE
Formation And Spacing:Code: SX-SN , Formation: SUSSEX-SHANNON , Order: , Unit Acreage: 80, Drill Unit: W2NE
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4700 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 125, Top: 3950 ft., Bottom: 4700 ft.

Wellbore Completed
Completion Date:12/8/2007
Spud Date:12/2/2007Spud Date Is:ACTUAL
Measured TD:7714 ft.Measured PB depth:7662 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL, CNL/CDL, DUAL INDUCTION
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 678 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 480, Top: 0 ft., Bottom: 678 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7696 ft., Weight: 12.6 , Citings Type: ACTUAL
Cement:Sacks: 340, Top: 6100 ft., Bottom: 7696 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4613 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 345, Top: 3250 ft., Bottom: 4613 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6524 ft.NN
FORT HAYS6768 ft.NN
CODELL6791 ft.NN
J SAND7254 ft.NN
DAKOTA7469 ft.NN
LAKOTA7545 ft.NN

Formation LKTA                     Formation Classification:  GW                     Status:  AB - 4/3/2008                  Interval Top: 7558 ft.    Interval Bottom: 7568 ft.

 Completed Information for Formation LAKOTA
1st Production Date:N/AChoke Size: 
Formation Name:LAKOTACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/8/2007
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation LKTA.
Perforation Data:
Interval Top:7558 ft.# Of Holes:30
Interval Bottom:7568 ft.Hole Size:0.39 in.

Formation DKTA                     Formation Classification:  GW                     Status:  AB - 8/22/2008                 Interval Top: 7472 ft.    Interval Bottom: 7494 ft.

 Completed Information for Formation DAKOTA
1st Production Date:4/24/2008Choke Size:0.640 in.
Formation Name:DAKOTACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/9/2008
Treatment Summary:DAKOTA PERFS 7472'-7476' (8 HOLES), 7486'-7494' (16 HOLES) FRAC'D DAKOTA USING 271 BBLS VISTAR 20# PAD, 625 BBLS OF VISTAR 20# FLUID SYSTEM, 49460 LBS OF 20/40 WHITE SAND, 8000 LBS OF SB EXCEL 20/40 RESIN COATED PROPPANT AND 3040 LBS OF 100 MESH PROPPAN
Tubing Size:2.375 in.Tubing Setting Depth:7456 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/1/2008Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1005
CALC_MCF_GAS 13
CASING_PRESS 1100
MCF_GAS 13
TUBING_PRESS 800
Perforation Data:
Interval Top:7472 ft.# Of Holes:24
Interval Bottom:7494 ft.Hole Size:0.39 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 7/19/2022                 Interval Top: 6577 ft.    Interval Bottom: 6800 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:8/30/2008Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:8/27/2008
Treatment Summary:NIOBRARA 6577'-6583' (18 HOLES) AND CODELL 6794'-6800' (18 HOLES) FRAC'D NIOBRARA/CODELL WITH 24 BBLS OF 15% HCL, 1057 BBLS OF SLICKWATER PAD, 954 BBLS OF VISTAR 20# PAD, --SEE OPERATORS COMMENTS
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 50
BTU_GAS 1341
CALC_BBLS_H2O 6
CALC_BBLS_OIL 50
CALC_GOR 2480
CALC_MCF_GAS 124
CASING_PRESS 1050
GRAVITY_OIL 48
MCF_GAS 124
TUBING_PRESS 750
Perforation Data:
Interval Top:6577 ft.# Of Holes:36
Interval Bottom:6800 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/19/2022
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No