|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 5/31/2018 Measured TD: 8480 ft. Vertical TD: 8361 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 5/31/2018 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20074733 | Expiration Date: | 8/29/2008 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 2130 FNL 510 FWL | | Bottom Hole Location: | Sec:18 Twp: 1N 68W | Footage: 2130 FNL 510 FWL | | Proposed Depth/Form: | 8454 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 320, Drill Unit: W2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: W2 | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5368 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 240, Top: 4362 ft., Bottom: 5368 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/5/2007 | | Spud Date: | 9/28/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 8480 ft. | Measured PB depth: | 8439 ft. | | True Vertical TD: | 8361 ft. | True Vertical PB depth: | 8320 ft. | | Top PZ Location: | Sec:18 Twp: 1N 68W | Footage: 2151 FNL 515 FWL | | Bottom Hole Location: | Sec:18 Twp: 1N 68W | Footage: 2151 FNL 515 FWL | | Log Types: | CBL,DUAL IND/COMPENSATED DENSITY/COMPENSATED NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 769 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 769 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8471 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 270, Top: 6864 ft., Bottom: 8471 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5437 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 170, Top: 4460 ft., Bottom: 5437 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4604 ft. | | N | N | | SHANNON | 5176 ft. | | N | N | | NIOBRARA | 7496 ft. | | N | N | | CODELL | 7886 ft. | | N | N | | J SAND | 8318 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 5/31/2018 Interval Top: 8328 ft. Interval Bottom: 8348 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/12/2007 | | Treatment Summary: | JSND COMPLETION; FRAC JSND W/186,942 GAL FRAC FLUID AND 250,080# SAND. 11/11/2007 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8328 ft. | # Of Holes: | 40 | | Interval Bottom: | 8348 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 5/31/2018 Interval Top: 7646 ft. Interval Bottom: 7926 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/11/2007 | | Treatment Summary: | NBRR-CDL RECOMP: SET CFP @8000'. 11/11/07 FRAC CODL W/113,512 GAL FRAC FLD & 250,820# 20/40 SAND.11/11/2007. ;SET CFP @7750'. 11/11/07 FRAC NBRR W/176,863 GAL FRAC FLUID & 251,020# 20/40 SAND 11/11/2007. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/19/2007 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 142 | | BBLS_OIL | 105 | | BTU_GAS | 1217 | | CALC_BBLS_H2O | 142 | | CALC_BBLS_OIL | 105 | | CALC_GOR | 4010 | | CALC_MCF_GAS | 421 | | CASING_PRESS | 1220 | | GRAVITY_OIL | 49 | | MCF_GAS | 421 |
| | Perforation Data: | | Interval Top: | 7646 ft. | # Of Holes: | 128 | | Interval Bottom: | 7926 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 12/22/2007 Interval Top: 7496 ft. Interval Bottom: 8348 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 12/20/2007 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/5/2007 | | Treatment Summary: | DRILLED OUT CFP @ 7750' AND 8000' TO COMMINGLE THE JSND-NBRR-CDL. 12/17/2007 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8311 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/22/2007 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 100 | | BBLS_OIL | 70 | | BTU_GAS | 1217 | | CALC_BBLS_H2O | 100 | | CALC_BBLS_OIL | 70 | | CALC_GOR | 5714 | | CALC_MCF_GAS | 400 | | CASING_PRESS | 1177 | | GRAVITY_OIL | 49 | | MCF_GAS | 400 | | TUBING_PRESS | 355 |
| | Perforation Data: | | Interval Top: | 7496 ft. | # Of Holes: | 168 | | Interval Bottom: | 8348 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 05/31/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|