|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 5/31/2018 Measured TD: 8480 ft. Vertical TD: 8344 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 5/31/2018 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20074734 | Expiration Date: | 8/29/2008 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 1980 FNL 1980 FWL | | Bottom Hole Location: | Sec:18 Twp: 1N 68W | Footage: 1980 FNL 1980 FWL | | Proposed Depth/Form: | 8468 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 320, Drill Unit: W2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: W/2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: W2 | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5396 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 240, Top: 4377 ft., Bottom: 5396 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/14/2007 | | Spud Date: | 10/6/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 8480 ft. | Measured PB depth: | 8433 ft. | | True Vertical TD: | 8344 ft. | True Vertical PB depth: | 8297 ft. | | Top PZ Location: | Sec:18 Twp: 1N 68W | Footage: 2007 FNL 1989 FWL | | Bottom Hole Location: | Sec:18 Twp: 1N 68W | Footage: 2007 FNL 1989 FWL | | Log Types: | CBL, DUAL IND/COMP.DENSITY/COMP.NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 773 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 360, Top: 0 ft., Bottom: 773 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8470 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 310, Top: 6912 ft., Bottom: 8470 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5426 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 160, Top: 4650 ft., Bottom: 5426 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SHANNON | 5186 ft. | | N | N | | NIOBRARA | 7505 ft. | | N | N | | CODELL | 7896 ft. | | N | N | | J SAND | 8328 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 5/31/2018 Interval Top: 8336 ft. Interval Bottom: 8352 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/14/2007 | | Treatment Summary: | JSND COMPLETION;FRAC JSND W/171,864 GAL FRAC FLUID & 249,780# SAND. 11/14/2007 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8336 ft. | # Of Holes: | 32 | | Interval Bottom: | 8352 ft. | Hole Size: | 0.41 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 12/18/2007 Interval Top: 7506 ft. Interval Bottom: 8352 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 12/16/2007 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/14/2007 | | Treatment Summary: | J/NBRR/CODELL COMMINGLED. DRILLED OUT CFP@7750. 12/12/07. DRILLED OUT CFP@8000 TO COMMINGLE THE JSND-NBRR-CODL 12/13/07. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8298 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/18/2007 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 37 | | BBLS_OIL | 47 | | BTU_GAS | 1312 | | CALC_BBLS_H2O | 37 | | CALC_BBLS_OIL | 47 | | CALC_GOR | 7021 | | CALC_MCF_GAS | 330 | | CASING_PRESS | 1212 | | GRAVITY_OIL | 49 | | MCF_GAS | 330 | | TUBING_PRESS | 320 |
| | Perforation Data: | | Interval Top: | 7506 ft. | # Of Holes: | 164 | | Interval Bottom: | 8352 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 5/31/2018 Interval Top: 7506 ft. Interval Bottom: 7916 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 11/17/2007 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/14/2007 | | Treatment Summary: | NBRR-CDL RECOMPLETION: SET CFP @8000'L FRAC CODL W/112,349 GAL FRAC FLUID & 250,680# 20/40 SAND 11/14/2007; SET CFP @7750' FRAC NBRR W/175,098 GAL FRAC FLUID & 250,320# 20/40 SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/14/2007 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 160 | | BBLS_OIL | 100 | | BTU_GAS | 1217 | | CALC_BBLS_H2O | 160 | | CALC_BBLS_OIL | 100 | | CALC_GOR | 3770 | | CALC_MCF_GAS | 377 | | CASING_PRESS | 810 | | GRAVITY_OIL | 49 | | MCF_GAS | 377 |
| | Perforation Data: | | Interval Top: | 7506 ft. | # Of Holes: | 132 | | Interval Bottom: | 7916 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 05/31/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|