|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 7/27/2022 Measured TD: 6993 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 7/27/2022 | | Wellbore Permit | DRIFTED | | Permit #: | 20073194 | Expiration Date: | 8/2/2008 | | Proposed Depth/Form: | 7580 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499-15 , Unit Acreage: 320, Drill Unit: S2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: S2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 80, Drill Unit: E2SW | | Formation And Spacing: | Code: SX-SN , Formation: SUSSEX-SHANNON , Order: , Unit Acreage: 80, Drill Unit: E2SW |
| | |
| Wellbore Completed | | Completion Date: | 4/17/2008 | | Spud Date: | 4/13/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 6993 ft. | Measured PB depth: | 6937 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL, CNL/CDL, DUAL INDUCTION | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 624 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 490, Top: 0 ft., Bottom: 624 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6977 ft., Weight: 10.5 , Citings Type: ACTUAL | | Cement: | Sacks: 795, Top: 384 ft., Bottom: 6977 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 615, Top: 384 ft., Bottom: 6054 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 6498 ft. | | N | N | | FORT HAYS | 6746 ft. | | N | N | | CODELL | 6770 ft. | | N | N |
Formation NB-CD Formation Classification: OW Status: AB - 7/27/2022 Interval Top: 6573 ft. Interval Bottom: 6780 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 8/4/2008 | Choke Size: | 0.250 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/1/2008 | | Treatment Summary: | NIOBRARA PERS 6573-6579 (12 HOLES) AND CODELL PERFS 6774-6780 (12 HOLES); FRAC'D NIOBRARA/CODELL WITH 1000 GALS OF 15% HCL, 1073 BBLS SLICKWATER PAD, 714 BBLS OF SILVERSTIM 22 PAD, 2928 BBLS OF SILVERSTIM 22 FLUID SYSTEM, 334800 LBS OF 30/50 WHITE SAND AN |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6760 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/1/2008 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 10 | | BBLS_OIL | 55 | | BTU_GAS | 1073 | | CALC_BBLS_H2O | 10 | | CALC_BBLS_OIL | 55 | | CALC_GOR | 2564 | | CALC_MCF_GAS | 141 | | CASING_PRESS | 857 | | GRAVITY_OIL | 46 | | MCF_GAS | 141 | | TUBING_PRESS | 503 |
| | Perforation Data: | | Interval Top: | 6573 ft. | # Of Holes: | 24 | | Interval Bottom: | 6780 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/27/2022 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|