|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 2/12/2019 Measured TD: 8810 ft. Vertical TD: 8415 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 2/12/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 6/29/2012 | | Proposed Top PZ Location: | Sec:8 Twp: 1N 68W | Footage: 2019 FNL 649 FWL | | Bottom Hole Location: | Sec:8 Twp: 1N 68W | Footage: 2016 FNL 643 FWL | | Proposed Depth/Form: | 8810 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: N/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: W2NW4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 923 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 1080, Top: 0 ft., Bottom: 923 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8796 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 778, Top: 3714 ft., Bottom: 8796 ft. |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 1/19/2009 | Spud Date Is: | ACTUAL | | Measured TD: | 8810 ft. | Measured PB depth: | 8765 ft. | | True Vertical TD: | 8415 ft. | True Vertical PB depth: | 8370 ft. | | Top PZ Location: | Sec:8 Twp: 1N 68W | Footage: 2019 FNL 649 FWL | | Bottom Hole Location: | Sec:8 Twp: 1N 68W | Footage: 2016 FNL 643 FWL | | Log Types: | CBL, DIL/GL/GR, CDL/CNL/ML | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 923 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 1080, Top: 0 ft., Bottom: 923 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8795 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 778, Top: 3876 ft., Bottom: 8795 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1140 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 225, Top: 478 ft., Bottom: 1140 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 475 ft., Depth: 1140 ft., Bottom: 1165 ft., Sacks: 225, Method: SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4381 ft. | | N | N | | SUSSEX | 4817 ft. | | N | N | | SHANNON | 5462 ft. | | N | N | | NIOBRARA | 7871 ft. | | N | N | | FORT HAYS | 8212 ft. | | N | N | | CODELL | 8232 ft. | | N | N | | J SAND | 8656 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 2/12/2019 Interval Top: 8672 ft. Interval Bottom: 8690 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 8/23/2010 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/4/2010 | | Treatment Summary: | Frac JSND w/ 161,952 gal SW & 115,600# 40/70 sand & 4,000# SuperLC. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8629 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/8/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 4 | | BTU_GAS | 1213 | | CALC_BBLS_OIL | 4 | | CALC_GOR | 23500 | | CALC_MCF_GAS | 94 | | CASING_PRESS | 960 | | GRAVITY_OIL | 49 | | MCF_GAS | 94 | | TUBING_PRESS | 656 |
| | Perforation Data: | | Interval Top: | 8672 ft. | # Of Holes: | 54 | | Interval Bottom: | 8690 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: GW Status: CM - 9/9/2010 Interval Top: 8230 ft. Interval Bottom: 8250 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 7/23/2009 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/28/2009 | | Treatment Summary: | 205,474 GALS FLUID & 150,020 LBS 40/70 SAND & 4,000 LBS 20/40 R/C SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 8230 ft. | # Of Holes: | 60 | | Interval Bottom: | 8250 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 2/12/2019 Interval Top: 7873 ft. Interval Bottom: 8250 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 7/23/2009 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/23/2010 | | Treatment Summary: | NBRR Perf 7873-8108 Holes 69 Size 0.42 CODL Perf 8230-8250 Holes 60 Size 0.38
No additional treatment. | | Formation Treatment | | Treatment Date: | 1/25/2009 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8629 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/8/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 4 | | BTU_GAS | 1213 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 4 | | CALC_GOR | 23500 | | CALC_MCF_GAS | 94 | | CASING_PRESS | 960 | | GRAVITY_OIL | 49 | | MCF_GAS | 94 | | TUBING_PRESS | 656 |
| | Perforation Data: | | Interval Top: | 7873 ft. | # Of Holes: | 129 | | Interval Bottom: | 8250 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 9/9/2010 Interval Top: 7873 ft. Interval Bottom: 8108 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 7/23/2009 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/29/2009 | | Treatment Summary: | 500 GALS ACID & 129,834 GALS FLUID & 100,000 LBS 40/70 SAND & 4,000 20/40 R/C SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7873 ft. | # Of Holes: | 69 | | Interval Bottom: | 8108 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 02/12/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|