Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-25790
Well Classification: GW Status: PA - 12/20/2018
Well Name/No:ANDERSEN #36-33
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date12/20/2018
FacilityID:295718LocationID:332769
County:WELD #123Location:SESW 33 4N65W 6
Field:WATTENBERG - #90750Elevation:4840 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:470FSL  2170 FWLLat/Long: 40.262910 / -104.669939Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.262910 / -104.669939Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/7/2011
End Date: 12/7/2011
Reported: 1/19/2012
Prior to rule 205A.b.(2)(A)
Days to report: 43
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 12/20/2018             Measured TD: 7820 ft.    Vertical TD: 7794 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 12/20/2018
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:6/28/2012
Proposed Top PZ Location:Sec: Twp: Footage: 100 FSL  2440 FWL
Bottom Hole Location:Sec:33 Twp: 4N 65W Footage: 100 FSL  2440 FWL
Proposed Depth/Form:7820 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 601 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 370, Top: 14 ft., Bottom: 601 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7815 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 662, Top: 3120 ft., Bottom: 7820 ft.

Wellbore Completed
Completion Date:7/7/2008
Spud Date:7/2/2008Spud Date Is:ACTUAL
Measured TD:7820 ft.Measured PB depth:7784 ft.
True Vertical TD:7794 ft.True Vertical PB depth:7758 ft.
Top PZ Location:Sec:33 Twp: 4N 65WFootage: 88 FSL  2441 FWL
Bottom Hole Location:Sec:33 Twp: 4N 65WFootage: 88 FSL  2441 FWL
Log Types:CBL, CDL/CNL/ML, DIL/GL/GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 593 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 370, Top: 15 ft., Bottom: 593 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7815 ft., Weight: 11.60 , Citings Type: ACTUAL
Cement:Sacks: 662, Top: 3120 ft., Bottom: 7815 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4218 ft.NN
SUSSEX4429 ft.NN
NIOBRARA-CODELL6936 ft.NN
NIOBRARA7008 ft.NN
CODELL7205 ft.NN
J SAND7662 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 12/20/2018                Interval Top: 7686 ft.    Interval Bottom: 7706 ft.

 Completed Information for Formation J SAND
1st Production Date:1/9/2012Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/7/2011
Treatment Summary:Frac J-Sand down 4-1/2" Csg w/ 166,026 gal Slickwater w/ 160,540# 40/70, 4,000# SuperLC.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7686 ft.# Of Holes:60
Interval Bottom:7706 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 3/29/2012                 Interval Top: 7200 ft.    Interval Bottom: 7220 ft.

 Completed Information for Formation CODELL
1st Production Date:9/4/2008Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/7/2008
Treatment Summary:167,202 GALS FLUID & 104,791 LBS 30/50 SAND & 4000 LBS 20/40 SB EXCEL SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7200 ft.# Of Holes:60
Interval Bottom:7220 ft.Hole Size:0.38 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 1/15/2012                 Interval Top: 6936 ft.    Interval Bottom: 7706 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:1/9/2012Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/15/2012Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 7
BTU_GAS 1207
CALC_BBLS_OIL 7
CALC_GOR 53571
CALC_MCF_GAS 375
CASING_PRESS 841
GRAVITY_OIL 61
MCF_GAS 375
Perforation Data:
Interval Top:6936 ft.# Of Holes:180
Interval Bottom:7706 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 12/20/2018                Interval Top: 6936 ft.    Interval Bottom: 7220 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:9/4/2008Choke Size:0.156 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/7/2008
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/17/2008Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1226
CALC_BBLS_H2O 0
CALC_BBLS_OIL 9
CALC_GOR 29112
CALC_MCF_GAS 262
CASING_PRESS 1700
GRAVITY_OIL 52
Perforation Data:
Interval Top:6936 ft.# Of Holes:120
Interval Bottom:7220 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 3/29/2012                 Interval Top: 6936 ft.    Interval Bottom: 7016 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/4/2008Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/7/2008
Treatment Summary:156,526 GALS FLUID & 277,792 LBS 30/50 SAND & 8000 LBS 20/40 SB EXCEL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6936 ft.# Of Holes:60
Interval Bottom:7016 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY12/20/2018
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No