|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 1/16/2019 Measured TD: 7540 ft. Vertical TD: 7434 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 1/16/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20076791 | Expiration Date: | 3/26/2009 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 50 FSL 1320 FEL | | Bottom Hole Location: | Sec:27 Twp: 3N 68W | Footage: 50 FSL 1320 FEL | | Proposed Depth/Form: | 7556 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: 3N68W |
| | |
| Wellbore Completed | | Completion Date: | 4/25/2008 | | Spud Date: | 4/20/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 7540 ft. | Measured PB depth: | 7473 ft. | | True Vertical TD: | 7434 ft. | True Vertical PB depth: | 7367 ft. | | Top PZ Location: | Sec:27 Twp: 3N 68W | Footage: 78 FSL 1337 FEL | | Bottom Hole Location: | Sec:27 Twp: 3N 68W | Footage: 78 FSL 1337 FEL | | Log Types: | CBL, DIL/GL/GR, CDL/CNL/ML | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 903 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 570, Top: 0 ft., Bottom: 903 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7507 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 555, Top: 3000 ft., Bottom: 7507 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3706 ft. | 3920 ft. | N | N | | SUSSEX | 4290 ft. | 4416 ft. | N | N | | SHANNON | 4667 ft. | 4710 ft. | N | N | | NIOBRARA | 7090 ft. | | N | N | | FORT HAYS | 7344 ft. | | N | N | | CODELL | 7364 ft. | 7385 ft. | N | N |
Formation CODL Formation Classification: OW Status: CM - 3/24/2011 Interval Top: 7365 ft. Interval Bottom: 7380 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 9/25/2008 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/24/2011 | | Treatment Summary: | CIBP SET AT 7340' KB DUMP BAIL SAND ON 1/24/2011. REMOVED CIBP ON 3/03/2011. WENT DOWNLINE WITH NB ON 3/08/2011. | | Formation Treatment | | Treatment Date: | 5/19/2008 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BTU_GAS | 1283 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 52 | | CALC_GOR | 1904 | | CALC_MCF_GAS | 99 | | CASING_PRESS | 700 | | GRAVITY_OIL | 51 |
| | Perforation Data: | | Interval Top: | 7365 ft. | # Of Holes: | 60 | | Interval Bottom: | 7380 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 1/17/2019 Interval Top: 7120 ft. Interval Bottom: 7380 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 3/8/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/3/2011 | | Treatment Summary: | NB-RECOMPLETE
CD- CIBP REMOVED |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7330 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/18/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 18 | | BTU_GAS | 1270 | | CALC_BBLS_OIL | 18 | | CALC_GOR | 5000 | | CALC_MCF_GAS | 90 | | CASING_PRESS | 1382 | | GRAVITY_OIL | 52 | | MCF_GAS | 90 | | TUBING_PRESS | 967 |
| | Perforation Data: | | Interval Top: | 7120 ft. | # Of Holes: | 120 | | Interval Bottom: | 7380 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 6/6/2011 Interval Top: 7120 ft. Interval Bottom: 7248 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 2/24/2011 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/16/2011 | | Treatment Summary: | Frac Niobrara A & B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 216,721 gal Slickwater w/ 200,100# 40/70, 4,000# SB Excel.
RETURNED DOWNLINE ON 3/8/2011 WITH CD AFTER CD CIBP REMOVED. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7120 ft. | # Of Holes: | 60 | | Interval Bottom: | 7248 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 01/17/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|