|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 9/25/2019 Measured TD: 7500 ft. Vertical TD: 7448 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 9/25/2019 | Wellbore Permit | DIRECTIONAL | Permit #: | 20042720 | Expiration Date: | 11/30/2005 | Prop Depth/Form: | 8200 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: SE | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: , Unit Acreage: 160, Drill Unit: SE | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: SE |
| | |
Wellbore Completed | Completion Date: | 6/6/2005 | Spud Date: | 3/25/2005 | Spud Date Is: | ACTUAL | Measured TD: | 7500 ft. | Measured PB depth: | 7427 ft. | True Vertical TD: | 7448 ft. | True Vertical PB depth: | 7375 ft. | Top PZ Location: | Sec:7 Twp: 5N 66W | Footage: 1300 FSL 1400 FEL | Depth | Bottom Hole Location: | Sec:7 Twp: 5N 66W | Footage: 1300 FSL 1400 FEL | Depth | Log Types: | DIL, GR, CALIPER, SP, MICRO LOG, COMP DEN/NEU | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 551 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 370, Top: 0 ft., Bottom: 551 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7472 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 140, Top: 6594 ft., Bottom: 7472 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4414 ft. | | N | N | SHANNON | 4852 ft. | | N | N | NIOBRARA | 7028 ft. | | N | N | FORT HAYS | 7322 ft. | | N | N | CODELL | 7342 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 9/13/2012 Interval Top: 7344 ft. Interval Bottom: 7360 ft. Completed Information for Formation CODELL | 1st Production Date: | 6/6/2005 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/6/2005 | Treatment Summary: | PERF'S CODL 7344'-7360' (64 HOLES), 5/20/05. FRAC'D CODELL W/130,536 GAL VISTAR 22/20# GEL & 265,920# 20/40 OTTAWA SAND, 6/2/05. | Formation Treatment | Treatment Date: | 5/20/2005 | Treatment Summary: | Pumped 232,877 lbs of Ottawa Proppant and 132,588 gallons of 15% HCL, Slick Water, and Vistar.
Commingle the Niobrara and Codell. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 19 | BBLS_OIL | 34 | BTU_GAS | 1280 | CALC_BBLS_H2O | 19 | CALC_BBLS_OIL | 34 | CALC_GOR | 8706 | CALC_MCF_GAS | 296 | CASING_PRESS | 1000 | GRAVITY_OIL | 56 | MCF_GAS | 296 | TUBING_PRESS | 500 |
| Perforation Data: | Interval Top: | 7344 ft. | # Of Holes: | 64 | Interval Bottom: | 7360 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 9/25/2019 Interval Top: 7028 ft. Interval Bottom: 7360 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 8/3/2012 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 5/20/2005 | Treatment Summary: | Niobrara Perfs: 7028-7173
Codell Perfs: 7344-7360 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7332 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 8/7/2012 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 4 | BBLS_OIL | 16 | BTU_GAS | 1320 | CALC_BBLS_H2O | 4 | CALC_BBLS_OIL | 16 | CALC_GOR | 4938 | CALC_MCF_GAS | 79 | CASING_PRESS | 992 | GRAVITY_OIL | 61 | MCF_GAS | 79 | TUBING_PRESS | 835 |
| Perforation Data: | Interval Top: | 7028 ft. | # Of Holes: | 112 | Interval Bottom: | 7360 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 11/8/2012 Interval Top: 7028 ft. Interval Bottom: 7173 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 8/3/2012 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 7/20/2012 | Treatment End Date: | 7/24/2012 | Treatment Summary: | Pumped 245,548 lbs of Ottawa Proppant and 146,975 gallons of Slick Water and Vistar.
Commingle the Niobrara and Codell. | Total fluid used in treatment (bbls): | 3499 | Max pressure during treatment (psi): | 4407 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 7 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.98 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 245548 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7028 ft. | # Of Holes: | 48 | Interval Bottom: | 7173 ft. | Hole Size: | 0.72 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|