Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-25560
Well Classification: OW Status: PA - 7/25/2023
Well Name/No:SCHMUNK #31-42
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/25/2023
FacilityID:294843LocationID:309900
County:WELD #123Location:SENE 31 7N65W 6
Field:EATON - #19350Elevation:4843 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1886FNL  617 FELLat/Long: 40.533630 / -104.698960Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.533610 / -104.698940Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 7/25/2023             Measured TD: 7478 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 7/25/2023
Wellbore Permit
Permit #:20080113 Expiration Date:3/5/2009
Proposed Depth/Form:7500 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 80, Drill Unit: E2NE4

Wellbore Completed
Completion Date:10/27/2008
Spud Date:10/22/2008Spud Date Is:ACTUAL
Measured TD:7478 ft.Measured PB depth:7448 ft.
True Vertical TD:True Vertical PB depth:
Log Types:COMPENSATED DENSITY NEUTRON GAMMA RAY; DUAL INDUCTION LOG GAMMA RAY; CEMENT BOND- VD
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 568 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 380, Top: 0 ft., Bottom: 568 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7465 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 640, Top: 3292 ft., Bottom: 7465 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND2915 ft.NN
PARKMAN3808 ft.NN
SUSSEX4400 ft.NN
NIOBRARA6955 ft.NN
FORT HAYS7219 ft.NN
CODELL7256 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 12/5/2008                 Interval Top: 7258 ft.    Interval Bottom: 7276 ft.

 Completed Information for Formation CODELL
1st Production Date:11/13/2008Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/3/2008
Treatment Summary:FRAC CODELL WITH 4005 BBLS SLICKWATER, AND 115000 30/50 SAND. SPEARHEAD 500 BBLS 7% KCL AHEAD OF FRAC. TREAT AT AN AVERAGE OF 4781 PSI 50.1 BPM. MAX. PRESSURE 5378 PSI MAX. RATE 51.8BPM
Tubing Size:2.375 in.Tubing Setting Depth:7243 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/5/2008Test Method:PLUNGER LIFT
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 4
BBLS_OIL 58
BTU_GAS 1242
CALC_GOR 948
CASING_PRESS 1100
GRAVITY_OIL 47
MCF_GAS 55
TUBING_PRESS 950
Perforation Data:
Interval Top:7258 ft.# Of Holes:64
Interval Bottom:7276 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 1/24/2010                 Interval Top: 6956 ft.    Interval Bottom: 7098 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/15/2010Choke Size:0.250 in.
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/14/2010
Treatment Summary:FRAC NIO W/ 4156 BBLS DYNAFLOW2 WR; 238000 30/50 SAND AND 17000 20/40 RESIN COATED SAND. SPEARHEAD 24 BBLS 15% ACID AHEAD OF FRAC AND 500 BBLS 7% KCL IN PRE=PAD. TREAT AT AN AVG 5170 PSI 54.3 BPM. MAX PRESSURE 6123, MAX RATE 61.7 BPM.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/24/2010Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 31
BTU_GAS 1242
CALC_GOR 1548
CASING_PRESS 225
GRAVITY_OIL 47
MCF_GAS 48
Perforation Data:
Interval Top:6956 ft.# Of Holes:136
Interval Bottom:7098 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 7/25/2023

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:2/18/2010Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/18/2010
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7249 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/8/2010Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 3
BBLS_OIL 27
BTU_GAS 1242
CALC_GOR 1222
CASING_PRESS 900
GRAVITY_OIL 47
MCF_GAS 33
TUBING_PRESS 650
Perforation Data:
Interval Top:# Of Holes:
Interval Bottom:Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/25/2023
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2024 - August 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No