Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-25548
Well Classification: OW Status: PA - 4/2/2025
Well Name/No:ANDERSON #34B
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date4/2/2025
FacilityID:294783LocationID:309889
County:WELD #123Location:SESW 34 7N66W 6
Field:EATON - #19350Elevation:4890 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1297FSL  1520 FWLLat/Long: 40.527610 / -104.769250Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.527640 / -104.769220Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 4/2/2025             Measured TD: 7495 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 4/2/2025
Wellbore Permit
Permit #:20088106 Expiration Date:12/23/2009
Proposed Depth/Form:7975 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: SW4
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 160, Drill Unit: SW4
Formation And Spacing:Code: SX-SN , Formation: SUSSEX-SHANNON , Order: , Unit Acreage: 160, Drill Unit: SW4
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: PLANNED
Cement:Sacks: 460, Top: 0 ft., Bottom: 6475 ft.

Wellbore Completed
Completion Date:3/24/2008
Spud Date:3/19/2008Spud Date Is:ACTUAL
Measured TD:7495 ft.Measured PB depth:7456 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL, CNL/CDL, DUAL INDUCTION
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 882 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 620, Top: 0 ft., Bottom: 882 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7481 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 975, Top: 0 ft., Bottom: 7481 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA7032 ft.NN
FORT HAYS7316 ft.NN
CODELL7337 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 5/18/2017                 Interval Top: 7340 ft.    Interval Bottom: 7350 ft.

 Completed Information for Formation CODELL
1st Production Date:5/13/2008Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:5/2/2008
Treatment Summary:FRAC'D CODELL USING 643 BBLS OF VISTAR 20# PAD, 1911 BBLS OF VISTAR 20# FLUID SYSTEM, 220280 LBS OF 20/40 WHITE SAND AND 8100 LBS OF SB EXCEL 20/40 RESIN COATED PROPPANT.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 49
BTU_GAS 1266
CALC_BBLS_H2O 1
CALC_BBLS_OIL 49
CALC_GOR 1020
CALC_MCF_GAS 50
CASING_PRESS 1900
GRAVITY_OIL 45
MCF_GAS 50
TUBING_PRESS 1400
Perforation Data:
Interval Top:7340 ft.# Of Holes:30
Interval Bottom:7350 ft.Hole Size:0.34 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 4/2/2025                  Interval Top: 7035 ft.    Interval Bottom: 7350 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:5/13/2008Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7035 ft.# Of Holes:66
Interval Bottom:7350 ft.Hole Size:

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 5/23/2017                 Interval Top: 7035 ft.    Interval Bottom: 7174 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/13/2008Choke Size: 
Formation Name:NIOBRARACommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:5/23/2017Treatment End Date:N/A
Treatment Summary:During the orginal completion, the Niobrara formation was perforated from 7035'- 7037' and 7164'- 7174' (3 spf). Duel fire 3 1/8" slickgun and EXT charges, 22.7 gram charge, 35.1" penetration, 120 degree phasing. The completion of this formation was never reported as they were unable to frac the formation, however, the perforations are still open. Please see attached operations summary for details.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7035 ft.# Of Holes:36
Interval Bottom:7174 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY04/02/2025
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveYNoticed Date
03/25/2025
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No