Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-25496
Well Classification: GW Status: PA - 7/29/2025
Well Name/No:CACHE #8-54
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/29/2025
FacilityID:294561LocationID:309871
County:WELD #123Location:SWSE 8 6N63W 6
Field:WATTENBERG - #90750Elevation:4695 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1223FSL  1441 FELLat/Long: 40.497300 / -104.456520Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.497310 / -104.456530Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 7/29/2025             Measured TD: 6987 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 7/29/2025
Wellbore Permit
Permit #:20077026 Expiration Date:2/18/2009
Proposed Depth/Form:7000 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 160, Drill Unit: SE4

Wellbore Completed
Completion Date:4/29/2008
Spud Date:4/24/2008Spud Date Is:ACTUAL
Measured TD:6987 ft.Measured PB depth:6965 ft.
True Vertical TD:True Vertical PB depth:
Log Types:COMP.DENS.NEUTRON GR; DUAL IDUCTION GR; CMNT COND-VD.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 514 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 514 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6979 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 480, Top: 3432 ft., Bottom: 6979 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3532 ft.NN
SUSSEX4298 ft.NN
SHANNON4950 ft.NN
NIOBRARA6528 ft.NN
FORT HAYS6786 ft.NN
CODELL6826 ft.NN

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 7/29/2025                 Interval Top: 6632 ft.    Interval Bottom: 6838 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/29/2008
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:6813 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/10/2008Test Method:PLUNGER LIFT
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 4
BBLS_OIL 37
BTU_GAS 1242
CALC_GOR 1837
CASING_PRESS 1400
GRAVITY_OIL 47
MCF_GAS 68
TUBING_PRESS 650
Perforation Data:
Interval Top:6632 ft.# Of Holes:192
Interval Bottom:6838 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 1/15/2010                 Interval Top: 6632 ft.    Interval Bottom: 6668 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/16/2008Choke Size:0.188 in.
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/15/2008
Treatment Summary:FRAC NIOBRARA WITH 4125 BBLS DYNALOW 2WR FLUID, AND 238000 30/50 SAND, AND 12000 20/40 RESIN COATED SAND. SPEARHEAD 24 BBLS 15% ACID AHEAD OF FRAC AND 500 BBLS 7% KCL IN PR-PAD. TREAT AT AN AVERGAGE OF 4175 56.8BPM. MAX. PRESSURE 5085 MAX. RATE 60.5BPM
Tubing Size:2.375 in.Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/20/2008Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 32
BBLS_OIL 68
BTU_GAS 1242
CALC_GOR 1662
CASING_PRESS 375
GRAVITY_OIL 47
MCF_GAS 113
Perforation Data:
Interval Top:6632 ft.# Of Holes:144
Interval Bottom:6668 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 6/21/2008                 Interval Top: 6626 ft.    Interval Bottom: 6838 ft.

 Completed Information for Formation CODELL
1st Production Date:5/29/2008Choke Size:0.250 in.
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/7/2008
Treatment Summary:FRAC CODELL W/4114 BBLS SLICKWATER & 115,000# 30/50 SAND. SPEARHEAD 500 BBLS 7% KCL AHEAD OF FRAC. TREAT @ AN AVERAGE OF 4723# 60.3 BPM. MAX PRESSURE 5464# MAX RATE 62.6 BPM.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/21/2008Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 2
BBLS_OIL 67
BTU_GAS 1242
CALC_GOR 1134
CASING_PRESS 250
GRAVITY_OIL 45
MCF_GAS 76
Perforation Data:
Interval Top:6626 ft.# Of Holes:48
Interval Bottom:6838 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/29/2025
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No