Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-25491
Well Classification: OW Status: PA - 12/13/2024
Well Name/No:BASHOR #9-42
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date12/13/2024
FacilityID:294575LocationID:309868
County:WELD #123Location:NWSE 9 6N63W 6
Field:WATTENBERG - #90750Elevation:4689 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1800FSL  2113 FELLat/Long: 40.498870 / -104.440000Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.498870 / -104.440010Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 12/13/2024             Measured TD: 6915 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 12/13/2024
Wellbore Permit
Permit #:20077123 Expiration Date:2/18/2009
Proposed Depth/Form:6930 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 80, Drill Unit: W2SE4

Wellbore Completed
Completion Date:3/21/2008
Spud Date:3/16/2008Spud Date Is:ACTUAL
Measured TD:6915 ft.Measured PB depth:6901 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CMT BOND/GR, COMP.DENSITY&NEUTRON/GR,DUAL IND/GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 502 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 275, Top: 0 ft., Bottom: 502 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6919 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 913, Top: 83 ft., Bottom: 6919 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3510 ft.3958 ft.NN
SUSSEX4229 ft.4449 ft.NN
SHANNON4872 ft.5012 ft.NN
NIOBRARA6459 ft.6717 ft.NN
CODELL6762 ft.6776 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 3/30/2021                 Interval Top: 6764 ft.    Interval Bottom: 6774 ft.

 Completed Information for Formation CODELL
1st Production Date:4/15/2008Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/12/2008
Treatment Summary:FRAC'D CODL W/ 254,606# 20/40 SAND USING 85,148 GAL 20# VISTAR
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:6764 ft.# Of Holes:40
Interval Bottom:6774 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 3/30/2021                 Interval Top: 6586 ft.    Interval Bottom: 6604 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/15/2008Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/12/2008
Treatment Summary:FRAC'D NBRR W/ 239,720# 20/40 & 12,000# SB EXCEL SAND USING 91,512 GAL 20# VISTAR.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6586 ft.# Of Holes:72
Interval Bottom:6604 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 12/13/2024                Interval Top: 6585 ft.    Interval Bottom: 6774 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:4/15/2008Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/12/2008
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 53
BTU_GAS 1289
CALC_GOR 3755
CASING_PRESS 1140
GRAVITY_OIL 45
MCF_GAS 199
TUBING_PRESS 750
Perforation Data:
Interval Top:6585 ft.# Of Holes:112
Interval Bottom:6774 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY12/13/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No