|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 12/13/2024 Measured TD: 6915 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 12/13/2024 | | Wellbore Permit | | | Permit #: | 20077123 | Expiration Date: | 2/18/2009 | | Proposed Depth/Form: | 6930 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 80, Drill Unit: W2SE4 |
| | |
| Wellbore Completed | | Completion Date: | 3/21/2008 | | Spud Date: | 3/16/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 6915 ft. | Measured PB depth: | 6901 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CMT BOND/GR, COMP.DENSITY&NEUTRON/GR,DUAL IND/GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 502 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 275, Top: 0 ft., Bottom: 502 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6919 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 913, Top: 83 ft., Bottom: 6919 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3510 ft. | 3958 ft. | N | N | | SUSSEX | 4229 ft. | 4449 ft. | N | N | | SHANNON | 4872 ft. | 5012 ft. | N | N | | NIOBRARA | 6459 ft. | 6717 ft. | N | N | | CODELL | 6762 ft. | 6776 ft. | N | N |
Formation CODL Formation Classification: OW Status: CM - 3/30/2021 Interval Top: 6764 ft. Interval Bottom: 6774 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 4/15/2008 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/12/2008 | | Treatment Summary: | FRAC'D CODL W/ 254,606# 20/40 SAND USING 85,148 GAL 20# VISTAR |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 6764 ft. | # Of Holes: | 40 | | Interval Bottom: | 6774 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 3/30/2021 Interval Top: 6586 ft. Interval Bottom: 6604 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 4/15/2008 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/12/2008 | | Treatment Summary: | FRAC'D NBRR W/ 239,720# 20/40 & 12,000# SB EXCEL SAND USING 91,512 GAL 20# VISTAR. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6586 ft. | # Of Holes: | 72 | | Interval Bottom: | 6604 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 12/13/2024 Interval Top: 6585 ft. Interval Bottom: 6774 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 4/15/2008 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/12/2008 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 6 | | BBLS_OIL | 53 | | BTU_GAS | 1289 | | CALC_GOR | 3755 | | CASING_PRESS | 1140 | | GRAVITY_OIL | 45 | | MCF_GAS | 199 | | TUBING_PRESS | 750 |
| | Perforation Data: | | Interval Top: | 6585 ft. | # Of Holes: | 112 | | Interval Bottom: | 6774 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 12/13/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|