|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 7/16/2020 Measured TD: 8195 ft. Vertical TD: 8096 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 7/16/2020 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 9/1/2012 | | Proposed Top PZ Location: | Sec:21 Twp: 2N 68W | Footage: 1398 FSL 2587 FWL | | Bottom Hole Location: | Sec:21 Twp: 2N 68W | Footage: 1411 FSL 2589 FWL | | Proposed Depth/Form: | 8195 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 863 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 540, Top: 0 ft., Bottom: 863 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8186 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 690, Top: 3840 ft., Bottom: 8186 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/13/2008 | | Spud Date: | 12/8/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 8195 ft. | Measured PB depth: | 8156 ft. | | True Vertical TD: | 8096 ft. | True Vertical PB depth: | 8057 ft. | | Top PZ Location: | Sec:21 Twp: 2N 68W | Footage: 1398 FSL 2587 FWL | | Bottom Hole Location: | Sec:21 Twp: 2N 68W | Footage: 1398 FSL 2587 FWL | | Log Types: | CBL, P/E AILC-CNLD-ML | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 863 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 540, Top: 0 ft., Bottom: 863 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8186 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 690, Top: 3840 ft., Bottom: 8186 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3900 ft. | 4100 ft. | N | N | | SUSSEX | 4450 ft. | 4650 ft. | N | N | | SHANNON | 4918 ft. | 4942 ft. | N | N | | TEEPEE BUTTES | 5064 ft. | 5068 ft. | N | N | | NIOBRARA | 7327 ft. | | N | N | | FORT HAYS | 7592 ft. | | N | N | | CODELL | 7612 ft. | | N | N | | J SAND | 8042 ft. | | N | N |
Formation JSND Formation Classification: OW Status: AB - 7/16/2020 Interval Top: 8054 ft. Interval Bottom: 8074 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 4/15/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/7/2011 | | Treatment Summary: | Frac J-Sand down 4-1/2" Csg w/ 153,678 gal Slickwater w/ 115,040# 30/50, 4,000# SuperLC. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8054 ft. | # Of Holes: | 60 | | Interval Bottom: | 8074 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: CM - 6/10/2011 Interval Top: 7613 ft. Interval Bottom: 7633 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 2/4/2009 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/16/2009 | | Treatment Summary: | 169,056 GALS FLUID & 116,520# 30/50 SAND & 4,000# 20/40 R/C |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7613 ft. | # Of Holes: | 60 | | Interval Bottom: | 7633 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 4/27/2011 Interval Top: 7326 ft. Interval Bottom: 8074 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 4/15/2011 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/7/2011 | | Treatment Summary: | JSND RECOMPLETE |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8029 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/27/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 10 | | BTU_GAS | 1240 | | CALC_BBLS_OIL | 10 | | CALC_GOR | 31000 | | CALC_MCF_GAS | 131 | | CASING_PRESS | 1218 | | GRAVITY_OIL | 52 | | MCF_GAS | 131 | | TUBING_PRESS | 927 |
| | Perforation Data: | | Interval Top: | 7326 ft. | # Of Holes: | 240 | | Interval Bottom: | 8074 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 7/16/2020 Interval Top: 7326 ft. Interval Bottom: 7633 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 2/4/2009 | Choke Size: | 0.250 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/13/2008 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7606 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/23/2009 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1313 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 32 | | CALC_GOR | 2750 | | CALC_MCF_GAS | 88 | | CASING_PRESS | 1900 | | GRAVITY_OIL | 51 | | TUBING_PRESS | 1800 |
| | Perforation Data: | | Interval Top: | 7326 ft. | # Of Holes: | 180 | | Interval Bottom: | 7633 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 6/10/2011 Interval Top: 7326 ft. Interval Bottom: 7500 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 2/4/2009 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/19/2009 | | Treatment Summary: | 1500 GALS ACID & 252,937 GALS FLUID & 376,760# 20/40 SAND & 8,000# 20/40 R/C |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7326 ft. | # Of Holes: | 120 | | Interval Bottom: | 7500 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/16/2020 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|