Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-25382
Well Classification: OW Status: TA - 5/26/2020
Well Name/No:WELLS RANCH AA #26-04
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:TAStatus Date5/26/2020
FacilityID:294468LocationID:309787
County:WELD #123Location:NWNW 26 6N63W 6
Field:CROW CREEK - #13610Elevation:4818 ft.
Planned Location:516FNL  626 FWLLat/Long: 40.463390 / -104.411370Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.463401 / -104.411346Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: TA - 5/26/2020             Measured TD: 7005 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        TA - 5/26/2020
Wellbore Permit
Permit #:20076293 Expiration Date:1/21/2009
Proposed Depth/Form:7000 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: W2NW4
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 80, Drill Unit: W2NW4

Wellbore Completed
Completion Date:3/16/2008
Spud Date:3/14/2008Spud Date Is:ACTUAL
Measured TD:7005 ft.Measured PB depth:6972 ft.
True Vertical TD:True Vertical PB depth:
Log Types:GR/CCL/CBL, CDL/CNL/ML, DIL/GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 583 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 295, Top: 0 ft., Bottom: 583 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6994 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 940, Top: 2070 ft., Bottom: 6994 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PIERRE2839 ft.NN
PARKMAN3655 ft.NN
SUSSEX4357 ft.NN
SHANNON4964 ft.NN
TEEPEE BUTTES5815 ft.NN
NIOBRARA6514 ft.NN
FORT HAYS6782 ft.NN
CODELL6815 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 5/26/2020                 Interval Top: 6843 ft.    Interval Bottom: 6853 ft.

 Completed Information for Formation CODELL
1st Production Date:6/19/2008Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/2/2008
Treatment Summary:CODL FRAC'D W/ 3387 GALS SLICKWATER & SILVERSTIM W/261,178# OTTAWA SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:6843 ft.# Of Holes:40
Interval Bottom:6853 ft.Hole Size:0.41 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  TA - 5/26/2020                 Interval Top: 6640 ft.    Interval Bottom: 6853 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:6/19/2008Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/16/2008
Treatment Summary:COMMINGLED CODELL & NIOBRARA
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 28
BTU_GAS 1244
CALC_BBLS_H2O 0
CALC_BBLS_OIL 28
CALC_GOR 929
CALC_MCF_GAS 26
CASING_PRESS 1380
GRAVITY_OIL 44
MCF_GAS 26
TUBING_PRESS 1150
Perforation Data:
Interval Top:6640 ft.# Of Holes:168
Interval Bottom:6853 ft.Hole Size:

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 5/26/2020                 Interval Top: 6640 ft.    Interval Bottom: 6740 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/19/2008Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/7/2008
Treatment Summary:NBRR FRAC'D W/184,859 GALS 15% HCI, SLICKWATER & SILVERSTIM W/ 250,080# OTTAWA SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6640 ft.# Of Holes:128
Interval Bottom:6740 ft.Hole Size:0.42 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (TA )YDefined Inactive
12/31/2014
Low ProducingYProduction Period
12/2023 - 11/2024

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No