COGIS - WELL SCOUT CARD
Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-25310
Well Classification: OW Status: PA - 6/6/2018
Well Name/No:COOPER #23-15
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date6/6/2018
FacilityID:294346LocationID:309727
County:WELD #123Location:SWNE 23 6N64W 6
Field:OWL CREEK - #65500Elevation:4652 ft.
Planned Location:1348FNL  1339 FELLat/Long: 40.475300 / -104.512620Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.475300 / -104.512640Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 6/6/2018             Measured TD: 6970 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 6/6/2018
Wellbore PermitDRIFTED
Permit #:20075877 Expiration Date:1/10/2009
Prop Depth/Form:7050 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: NE/4

Wellbore Completed
Completion Date:4/4/2008
Spud Date:3/31/2008Spud Date Is:ACTUAL
Measured TD:6970 ft.Measured PB depth:6915 ft.
True Vertical TD:True Vertical PB depth:
Log Types:SONIC BOND/GR, COMP.DENSITY & NEUTRON/GR, DUAL IND./GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 503 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 265, Top: 0 ft., Bottom: 503 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6932 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 228, Top: 0 ft., Bottom: 6932 ft., Determination Method: VISU
FormationInterval TopLog BottomCoredDSTs
PARKMAN3434 ft.3951 ft.NN
SUSSEX4284 ft.4473 ft.NN
SHANNON4886 ft.5038 ft.NN
NIOBRARA6499 ft.6768 ft.NN
CODELL6812 ft.6828 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 8/16/2008                 Interval Top: 6814 ft.    Interval Bottom: 6826 ft.

 Completed Information for Formation CODELL
1st Production Date:5/20/2008Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/25/2008
Treatment Summary:FRAC'D CODL W/ 252,355# 30/50 SAND USING 82,102 GALS 26# SILVERSTIM.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:6814 ft.# Of Holes:48
Interval Bottom:6826 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 6/6/2018                  Interval Top: 6647 ft.    Interval Bottom: 6826 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:5/20/2008Choke Size:0.188 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/30/2008
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:6790 ft.
Tubing Packer Depth:6910 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/16/2008Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 4
BBLS_OIL 70
BTU_GAS 1319
CALC_GOR 2514
CASING_PRESS 900
GRAVITY_OIL 44
MCF_GAS 176
TUBING_PRESS 400
Perforation Data:
Interval Top:6647 ft.# Of Holes:132
Interval Bottom:6826 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 8/16/2008                 Interval Top: 6647 ft.    Interval Bottom: 6668 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/20/2008Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/30/2008
Treatment Summary:FRAC'D NBRR W/ 250,120# 30/50 & 12,000# SB EXCEL SAND USING 94,921 GALS 26# SILVERSTIM
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6647 ft.# Of Holes:84
Interval Bottom:6668 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No