|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 7/20/2023 Measured TD: 7340 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 7/20/2023 | | Wellbore Permit | | | Permit #: | 20071369 | Expiration Date: | 4/17/2008 | | Proposed Depth/Form: | 7750 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499-15 , Unit Acreage: 320, Drill Unit: W2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: W2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W2NW |
| | |
| Wellbore Completed | | Completion Date: | 5/4/2007 | | Spud Date: | 4/28/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 7340 ft. | Measured PB depth: | 7273 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL, CNL/CDL, DUAL INDUCTION | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1258 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 880, Top: 0 ft., Bottom: 1258 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7313 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 230, Top: 5946 ft., Bottom: 7313 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3500 ft. | | N | N | | SUSSEX | 4158 ft. | | N | N | | NIOBRARA | 6464 ft. | | N | N | | FORT HAYS | 6692 ft. | | N | N | | CODELL | 6715 ft. | | N | N | | J SAND | 7182 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 8/1/2007 Interval Top: 6718 ft. Interval Bottom: 6728 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 7/7/2007 | Choke Size: | 0.250 in. | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/5/2007 | | Treatment Summary: | FRAC'D CODELL W/2549 BBLS OF VISTAR 20# FLUID SYSTEM,220,540 LBS OF 20/40 WHITE SAND, 8000 LBS OF SUPER LC 20/40 RESIN COATED PROPPANT. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/1/2007 | Test Method: | FLOW UP CASING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 5 | | BBLS_OIL | 23 | | BTU_GAS | 1298 | | CALC_BBLS_H2O | 5 | | CALC_BBLS_OIL | 23 | | CALC_GOR | 1739 | | CALC_MCF_GAS | 40 | | CASING_PRESS | 1350 | | GRAVITY_OIL | 50 | | MCF_GAS | 40 |
| | Perforation Data: | | Interval Top: | 6718 ft. | # Of Holes: | 30 | | Interval Bottom: | 6728 ft. | Hole Size: | 0.34 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 7/20/2023 Interval Top: 6470 ft. Interval Bottom: 6728 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 8/24/2007 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/4/2007 | | Treatment Summary: | DRILLED OUT PLUG TO COMMINGLE THE CODELL WITH THE NIOBRARA. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 4 | | BBLS_OIL | 36 | | BTU_GAS | 1270 | | CALC_BBLS_H2O | 4 | | CALC_BBLS_OIL | 36 | | CALC_GOR | 5444 | | CALC_MCF_GAS | 196 | | CASING_PRESS | 700 | | GRAVITY_OIL | 49 | | MCF_GAS | 196 | | TUBING_PRESS | 300 |
| | Perforation Data: | | Interval Top: | 6470 ft. | # Of Holes: | 78 | | Interval Bottom: | 6728 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 6/29/2007 Interval Top: 6470 ft. Interval Bottom: 6552 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/2/2007 | | Treatment Summary: | NBRR "A" 6470'-6472 (6 SHOTS) NBRR "B" 6538'-6552' (42 SHOTS) FRAC'D NBRR W/500 GAL 15% HCL,1500 BBLS SLICKWATER PAD, 275 BBLS OF VISTAR 18# PAD,2294 BBLS VISTAR 18# FLUID SYSTEM,245,440 LBS 30/50 WHITE SAND & 8000 LBS SUPER LC 20/40 RESIN COATED PROPPANT |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6470 ft. | # Of Holes: | 48 | | Interval Bottom: | 6552 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/20/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2029 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|