Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-25002
Well Classification: OW Status: PA - 6/12/2019
Well Name/No:MAYER #31-15
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date6/12/2019
FacilityID:290064LocationID:332560
County:WELD #123Location:NWNW 15 3N67W 6
Field:WATTENBERG - #90750Elevation:4794 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:542FNL  465 FWLLat/Long: 40.231440 / -104.884580Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.231442 / -104.884572Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/2/2012
End Date: 3/2/2012
Reported: 5/1/2012
Prior to rule 205A.b.(2)(A)
Days to report: 60
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 6/12/2019             Measured TD: 7360 ft.    Vertical TD: 7254 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 6/12/2019
Wellbore PermitDIRECTIONAL
Permit #:20071142 Expiration Date:4/9/2008
Proposed Top PZ Location:Sec: Twp: Footage: 1320 FNL  75 FWL
Bottom Hole Location:Sec:15 Twp: 3N 67W Footage: 1320 FNL  75 FWL
Proposed Depth/Form:7179 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA

Wellbore Completed
Completion Date:2/16/2008
Spud Date:2/6/2008Spud Date Is:ACTUAL
Measured TD:7360 ft.Measured PB depth:7330 ft.
True Vertical TD:7254 ft.True Vertical PB depth:7224 ft.
Top PZ Location:Sec:15 Twp: 3N 67WFootage: 1317 FNL  68 FWL
Bottom Hole Location:Sec:15 Twp: 3N 67WFootage: 1317 FNL  68 FWL
Log Types:CBL, DIL/GL/GR, CDL/CNL/ML
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 792 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 340, Top: 0 ft., Bottom: 792 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7346 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 555, Top: 2350 ft., Bottom: 7346 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3570 ft.NN
SUSSEX4180 ft.NN
SHANNON4610 ft.NN
NIOBRARA6912 ft.NN
FORT HAYS7164 ft.NN
CODELL7189 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 4/10/2012                 Interval Top: 7193 ft.    Interval Bottom: 7208 ft.

 Completed Information for Formation CODELL
1st Production Date:5/15/2008Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/2/2012
Treatment Summary:CD PERF 7193-7208 HOLES 60 SIZE 0.38 Refrac CODL down 4.5" casing w/ 204,666 gal slickwater. No proppant used on this job. Broke @ 2,796 psi @ 3.1 bpm. ATP=5,149 psi; MTP=5,618 psi; ATR=55.3 bpm; ISDP=2,780 psi
Formation Treatment
Treatment Date:2/26/2008
Treatment Summary:132,238 GALS FLUID & 220,040# 20/40 SAND & 4000# 20/40 SB EXCEL SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BTU_GAS 1283
CALC_BBLS_H2O 0
CALC_BBLS_OIL 67
CALC_GOR 2320
CALC_MCF_GAS 155
CASING_PRESS 125
GRAVITY_OIL 51
Perforation Data:
Interval Top:7193 ft.# Of Holes:60
Interval Bottom:7208 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 6/12/2019                 Interval Top: 6938 ft.    Interval Bottom: 7208 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:3/8/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/2/2012
Treatment Summary:NB PERF 6938-7076 HOLES 72 SIZE 0.42 CD PERF 7193-7208 HOLES 60 SIZE 0.38
Tubing Size:2.375 in.Tubing Setting Depth:7164 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/22/2012Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1332
CALC_GOR 17000
CALC_MCF_GAS 17
CASING_PRESS 1200
GRAVITY_OIL 53
MCF_GAS 17
TUBING_PRESS 1200
Perforation Data:
Interval Top:6938 ft.# Of Holes:132
Interval Bottom:7208 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 6/22/2012                 Interval Top: 6938 ft.    Interval Bottom: 7076 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/8/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/2/2012
Treatment Summary:NB PERF 6938-7076 HOLES 72 SIZE 0.42 Frac NBRR down 4.5" casing w/ 252 gal 15% HCl & 246,330 gal slickwater. No proppant used on this job. Broke @ 3,225 psi @ 2.9 bpm. ATP=5,090 psi; MTP=5,645 psi; ATR=59.3 bpm; ISDP=3,527 psi
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6938 ft.# Of Holes:72
Interval Bottom:7076 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY06/12/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No