|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 4/25/2017 Measured TD: 7650 ft. Vertical TD: 7471 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 4/25/2017 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20071068 | Expiration Date: | 4/3/2008 | | Proposed Top PZ Location: | Sec:24 Twp: 3N 68W | Footage: 51 FSL 1325 FWL | | Bottom Hole Location: | Sec:24 Twp: 3N 68W | Footage: 37 FSL 1324 FWL | | Proposed Depth/Form: | 7622 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 318A , Unit Acreage: 160, Drill Unit: GWA |
| | |
| Wellbore Completed | | Completion Date: | 2/29/2008 | | Spud Date: | 2/20/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 7650 ft. | Measured PB depth: | 7605 ft. | | True Vertical TD: | 7471 ft. | True Vertical PB depth: | 7426 ft. | | Top PZ Location: | Sec:24 Twp: 3N 68W | Footage: 51 FSL 1325 FWL | | Bottom Hole Location: | Sec:24 Twp: 3N 68W | Footage: 37 FSL 1324 FWL | | Log Types: | CBL, P/E AICL-CNLD-ML | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 905 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 430, Top: 0 ft., Bottom: 905 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 6.5 in., Size: 4.5 in., Top: 0 ft., Depth: 7639 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 311, Top: 3510 ft., Bottom: 7639 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1426 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 75, Top: 862 ft., Bottom: 1436 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 862 ft., Depth: 1427 ft., Bottom: 1434 ft., Sacks: 75, Method: DV TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4052 ft. | 5808 ft. | N | N | | SUSSEX | 4267 ft. | 4424 ft. | N | N | | SHANNON | 4806 ft. | 4836 ft. | N | N | | NIOBRARA | 7232 ft. | | N | N | | FORT HAYS | 7464 ft. | | N | N | | CODELL | 7486 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 12/22/2008 Interval Top: 7487 ft. Interval Bottom: 7502 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/26/2008 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/10/2008 | | Treatment Summary: | 162,078 GALS FLUID & 115,920# 40/70 SAND & 4000# 20/40 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7487 ft. | # Of Holes: | 60 | | Interval Bottom: | 7502 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 4/25/2017 Interval Top: 7240 ft. Interval Bottom: 7502 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/26/2008 | Choke Size: | 0.188 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/29/2008 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/23/2008 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1233 | | CALC_BBLS_OIL | 175 | | CALC_GOR | 1640 | | CALC_MCF_GAS | 287 | | CASING_PRESS | 2100 | | GRAVITY_OIL | 51 |
| | Perforation Data: | | Interval Top: | 7240 ft. | # Of Holes: | 142 | | Interval Bottom: | 7502 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 12/22/2008 Interval Top: 7240 ft. Interval Bottom: 7370 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/26/2008 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/10/2008 | | Treatment Summary: | 249,564 GALS FLUID & 1000 GALS ACID & 200,860# 40/70 SAND & 4000# 20/40 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7240 ft. | # Of Holes: | 82 | | Interval Bottom: | 7370 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/25/2017 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|