|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 4/1/2025 Measured TD: 7825 ft. Vertical TD: 7713 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 4/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20070664 | Expiration Date: | 3/21/2008 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 52 FSL 1306 FWL | | Bottom Hole Location: | Sec:26 Twp: 4N 65W | Footage: 52 FSL 1326 FWL | | Proposed Depth/Form: | 7763 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 318, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 318, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 318, Drill Unit: GWA | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5150 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 240, Top: 4150 ft., Bottom: 5150 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/13/2007 | | Spud Date: | 4/6/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 7825 ft. | Measured PB depth: | 7752 ft. | | True Vertical TD: | 7713 ft. | True Vertical PB depth: | 7640 ft. | | Top PZ Location: | Sec:26 Twp: 4N 65W | Footage: 65 FSL 1312 FWL | | Bottom Hole Location: | Sec:26 Twp: 4N 65W | Footage: 65 FSL 1312 FWL | | Log Types: | CBL,DUAL IND/COMP.DENSITY/COMP.NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 529 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 265, Top: 0 ft., Bottom: 529 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7797 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 270, Top: 6058 ft., Bottom: 7797 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4900 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 230, Top: 3700 ft., Bottom: 4910 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SHANNON | | | N | N | | SUSSEX | 4440 ft. | | N | N | | NIOBRARA | 6874 ft. | | N | N | | CODELL | 7154 ft. | | N | N | | J SAND | 7622 ft. | | N | N |
Formation JSND Formation Classification: GW Status: SI - 4/1/2025 Interval Top: 7640 ft. Interval Bottom: 7686 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 5/1/2007 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/19/2007 | | Treatment Summary: | Frac;d the J w/ 182,406 gal frac fluid & 251,680# sand. | | Formation Treatment | | Treatment Date: | 4/17/2007 | | Treatment Summary: | J SAND COMPLETION FRAC'D THE J SAND WITH 251,680# 20/40 SAND, 12,000# 20/40 SUPER LC 04/17/2007 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7640 ft. | # Of Holes: | 60 | | Interval Bottom: | 7686 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: GW Status: CM - 3/29/2023 Interval Top: 7154 ft. Interval Bottom: 7170 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 5/1/2007 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7154 ft. | # Of Holes: | 64 | | Interval Bottom: | 7170 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 9/13/2011 Interval Top: 6874 ft. Interval Bottom: 7686 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 4/20/2007 | | Treatment Summary: | NBRR-CDL RECOMPLETION SET CFP @ 7270' FRAC'D THE CODELL W/ 250,400# 20/40 SAND, 12,000# 20/40 SUPER LC 04/20/2007 SET CFP @ 7050' FRAC'D THE NIOBRARA W/ 43,722# 20/40 SAND, 12,000# 20/40 SUPER LC 04/20/2007 | | Formation Treatment | | Treatment Date: | 4/19/2007 | | Treatment Summary: | NBRR-CDL RECOMPLETION SET CFP @ 7270' 4-19-07 FRAC'D THE CODELL WITH 115,248 GAL FRAC FLUID AND 250,400# SAND 04-19-07 SET CFP @ 7050 04-19-07 FRAC'D THE NIOBRARA WITH 99,750 GAL FRAC FLUID AND 43,722# SAND 04-19-07 | | Formation Treatment | | Treatment Date: | 4/13/2007 | | Treatment Summary: | JSND-NBRR-CDL COMMINGLE. DRILLED OUT CFP @ 7050' 07/04/2007. DRILLED OUT CFP @ 7270' TO COMMINGLE THE JSND/NBRR/CDL 07/05/2007. | | Formation Treatment | | Treatment Date: | 5/31/2001 | | Treatment Summary: | COBP @ 7220 AND CFP @ 6969 ON 4/8/11. DRILLED OUT 5/26/11. TUBING WAS SET @ 7627 ON 5/26/11. COMMINGLED ON 5/28/2011. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7627 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/31/2001 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 14 | | BBLS_OIL | 26 | | BTU_GAS | 125 | | CALC_BBLS_H2O | 14 | | CALC_BBLS_OIL | 26 | | CALC_GOR | 12346 | | CALC_MCF_GAS | 321 | | CASING_PRESS | 662 | | GRAVITY_OIL | 62 | | MCF_GAS | 321 | | TUBING_PRESS | 385 |
| | Perforation Data: | | Interval Top: | 6874 ft. | # Of Holes: | 188 | | Interval Bottom: | 7686 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 4/1/2025 Interval Top: 6874 ft. Interval Bottom: 7170 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 5/1/2007 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/8/2011 | | Treatment Summary: | NIOBRARA - FRAC'D 6874-6962 W/138054 GAL FRAC FLUID AND 274818# SAND.
CODELL - FRAC'D 7154-7170 W/118482 GAL FRAC FLUID AND 251260 # SAND.
CIBP SET @ 7220 AND CFP @ 6969 ON 4/8/11. DRILLED OUT 5/26/11. | | Formation Treatment | | Treatment Date: | 4/19/2007 | | Treatment Summary: | NBRR-CDL RECOMPLETION. PLEASE SEE SCANNED DOCUMENT FOR DETAILS. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 15 | | BBLS_OIL | 35 | | CALC_BBLS_H2O | 15 | | CALC_BBLS_OIL | 35 | | CALC_GOR | 12400 | | CALC_MCF_GAS | 434 | | CASING_PRESS | 1900 | | MCF_GAS | 434 |
| | Perforation Data: | | Interval Top: | 6874 ft. | # Of Holes: | 128 | | Interval Bottom: | 7170 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 3/29/2023 Interval Top: 6874 ft. Interval Bottom: 6962 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 5/1/2007 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6874 ft. | # Of Holes: | 64 | | Interval Bottom: | 6962 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 39 |
| Total Gas Produced (MCF) | 656 |
| GOR | 16820 |
| GOR Determination | MCFE |
| Average BOE per Day | 0.409 |
| Average MCFE per Day | 2.371 |
| Federal Financial Assurance | i | |
|
|