Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-24925
Well Classification: GW Status: SI - 4/1/2025
Well Name/No:BEEBE DRAW #2-8-26
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date4/1/2025
FacilityID:289812LocationID:332760
County:WELD #123Location:SWSW 26 4N65W 6
Field:WATTENBERG - #90750Elevation:4736 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:493FSL  495 FWLLat/Long: 40.277420 / -104.638250Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.277420 / -104.638250Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/8/2011
End Date: 4/8/2011
Reported: 2/15/2012
Prior to rule 205A.b.(2)(A)
Days to report: 313
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 4/1/2025             Measured TD: 7825 ft.    Vertical TD: 7713 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 4/1/2025
Wellbore PermitDIRECTIONAL
Permit #:20070664 Expiration Date:3/21/2008
Proposed Top PZ Location:Sec: Twp: Footage: 52 FSL  1306 FWL
Bottom Hole Location:Sec:26 Twp: 4N 65W Footage: 52 FSL  1326 FWL
Proposed Depth/Form:7763 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 318, Drill Unit: GWA
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 318, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 318, Drill Unit: GWA
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5150 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 240, Top: 4150 ft., Bottom: 5150 ft.

Wellbore Completed
Completion Date:4/13/2007
Spud Date:4/6/2007Spud Date Is:ACTUAL
Measured TD:7825 ft.Measured PB depth:7752 ft.
True Vertical TD:7713 ft.True Vertical PB depth:7640 ft.
Top PZ Location:Sec:26 Twp: 4N 65WFootage: 65 FSL  1312 FWL
Bottom Hole Location:Sec:26 Twp: 4N 65WFootage: 65 FSL  1312 FWL
Log Types:CBL,DUAL IND/COMP.DENSITY/COMP.NEUTRON
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 529 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 265, Top: 0 ft., Bottom: 529 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7797 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 270, Top: 6058 ft., Bottom: 7797 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4900 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 230, Top: 3700 ft., Bottom: 4910 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SHANNONNN
SUSSEX4440 ft.NN
NIOBRARA6874 ft.NN
CODELL7154 ft.NN
J SAND7622 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  SI - 4/1/2025                  Interval Top: 7640 ft.    Interval Bottom: 7686 ft.

 Completed Information for Formation J SAND
1st Production Date:5/1/2007Choke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/19/2007
Treatment Summary:Frac;d the J w/ 182,406 gal frac fluid & 251,680# sand.
Formation Treatment
Treatment Date:4/17/2007
Treatment Summary:J SAND COMPLETION FRAC'D THE J SAND WITH 251,680# 20/40 SAND, 12,000# 20/40 SUPER LC 04/17/2007
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7640 ft.# Of Holes:60
Interval Bottom:7686 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 3/29/2023                 Interval Top: 7154 ft.    Interval Bottom: 7170 ft.

 Completed Information for Formation CODELL
1st Production Date:5/1/2007Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7154 ft.# Of Holes:64
Interval Bottom:7170 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 9/13/2011                 Interval Top: 6874 ft.    Interval Bottom: 7686 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:4/20/2007
Treatment Summary:NBRR-CDL RECOMPLETION SET CFP @ 7270' FRAC'D THE CODELL W/ 250,400# 20/40 SAND, 12,000# 20/40 SUPER LC 04/20/2007 SET CFP @ 7050' FRAC'D THE NIOBRARA W/ 43,722# 20/40 SAND, 12,000# 20/40 SUPER LC 04/20/2007
Formation Treatment
Treatment Date:4/19/2007
Treatment Summary:NBRR-CDL RECOMPLETION SET CFP @ 7270' 4-19-07 FRAC'D THE CODELL WITH 115,248 GAL FRAC FLUID AND 250,400# SAND 04-19-07 SET CFP @ 7050 04-19-07 FRAC'D THE NIOBRARA WITH 99,750 GAL FRAC FLUID AND 43,722# SAND 04-19-07
Formation Treatment
Treatment Date:4/13/2007
Treatment Summary:JSND-NBRR-CDL COMMINGLE. DRILLED OUT CFP @ 7050' 07/04/2007. DRILLED OUT CFP @ 7270' TO COMMINGLE THE JSND/NBRR/CDL 07/05/2007.
Formation Treatment
Treatment Date:5/31/2001
Treatment Summary:COBP @ 7220 AND CFP @ 6969 ON 4/8/11. DRILLED OUT 5/26/11. TUBING WAS SET @ 7627 ON 5/26/11. COMMINGLED ON 5/28/2011.
Tubing Size:2.375 in.Tubing Setting Depth:7627 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/31/2001Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 14
BBLS_OIL 26
BTU_GAS 125
CALC_BBLS_H2O 14
CALC_BBLS_OIL 26
CALC_GOR 12346
CALC_MCF_GAS 321
CASING_PRESS 662
GRAVITY_OIL 62
MCF_GAS 321
TUBING_PRESS 385
Perforation Data:
Interval Top:6874 ft.# Of Holes:188
Interval Bottom:7686 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  SI - 4/1/2025                  Interval Top: 6874 ft.    Interval Bottom: 7170 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:5/1/2007Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/8/2011
Treatment Summary:NIOBRARA - FRAC'D 6874-6962 W/138054 GAL FRAC FLUID AND 274818# SAND. CODELL - FRAC'D 7154-7170 W/118482 GAL FRAC FLUID AND 251260 # SAND. CIBP SET @ 7220 AND CFP @ 6969 ON 4/8/11. DRILLED OUT 5/26/11.
Formation Treatment
Treatment Date:4/19/2007
Treatment Summary:NBRR-CDL RECOMPLETION. PLEASE SEE SCANNED DOCUMENT FOR DETAILS.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 15
BBLS_OIL 35
CALC_BBLS_H2O 15
CALC_BBLS_OIL 35
CALC_GOR 12400
CALC_MCF_GAS 434
CASING_PRESS 1900
MCF_GAS 434
Perforation Data:
Interval Top:6874 ft.# Of Holes:128
Interval Bottom:7170 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 3/29/2023                 Interval Top: 6874 ft.    Interval Bottom: 6962 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/1/2007Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6874 ft.# Of Holes:64
Interval Bottom:6962 ft.Hole Size:0.42 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)39
Total Gas Produced (MCF)656
GOR16820
GOR DeterminationMCFE
Average BOE per Day0.409
Average MCFE per Day2.371

 Federal Financial Assurance  i 

 Tribal Well  i No