|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 1/25/2024 Measured TD: 7502 ft. Vertical TD: 7383 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 1/25/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20070482 | Expiration Date: | 3/5/2008 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 2530 FNL 1230 FWL | | Bottom Hole Location: | Sec:19 Twp: 3N 67W | Footage: 2530 FNL 1230 FWL | | Proposed Depth/Form: | 7505 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA |
| | |
| Wellbore Completed | | Completion Date: | 4/8/2007 | | Spud Date: | 4/3/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 7502 ft. | Measured PB depth: | 7483 ft. | | True Vertical TD: | 7383 ft. | True Vertical PB depth: | 7364 ft. | | Top PZ Location: | Sec:19 Twp: 3N 67W | Footage: 2562 FNL 1230 FWL | | Bottom Hole Location: | Sec:19 Twp: 3N 67W | Footage: 2562 FNL 1230 FWL | | Log Types: | CBL, P/E AILC-CNLD-ML | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 771 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 540, Top: 0 ft., Bottom: 771 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7499 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 500, Top: 3394 ft., Bottom: 7499 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3696 ft. | | N | N | | SUSSEX | 4297 ft. | | N | N | | SHANNON | 4708 ft. | | N | N | | NIOBRARA | 7057 ft. | | N | N | | FORT HAYS | 7322 ft. | | N | N | | CODELL | 7343 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 4/5/2011 Interval Top: 7346 ft. Interval Bottom: 7366 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 8/1/2007 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/23/2011 | | Treatment Summary: | CD Perf 7346-7366 Holes 60 Size 0.45
2/10/11 -Set CIBP w/ sand cap @ 7280 for NB Recomplete
3/17/11 -Drill out CIBP at 7280. Circ to 7483 (PBTD).
3/23/11 -Commingled with NBRR Formation | | Formation Treatment | | Treatment Date: | 5/28/2007 | | Treatment Summary: | 129,654 GALS FLUID & 220,000# 20/40 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BTU_GAS | 1245 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 16 | | CALC_GOR | 5250 | | CALC_MCF_GAS | 84 | | CASING_PRESS | 225 | | GRAVITY_OIL | 52 |
| | Perforation Data: | | Interval Top: | 7346 ft. | # Of Holes: | 60 | | Interval Bottom: | 7366 ft. | Hole Size: | 0.45 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 1/25/2024 Interval Top: 7102 ft. Interval Bottom: 7366 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 3/23/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/17/2011 | | Treatment Summary: | NB Perf 7102-7220 Holes 64 Size 0.41
CD Perf 7346-7366 Holes 60 Size 0.45
3/17/11-Drill out CIBP to commingle well. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7324 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/1/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 9 | | BTU_GAS | 1322 | | CALC_BBLS_OIL | 9 | | CALC_GOR | 8889 | | CALC_MCF_GAS | 80 | | CASING_PRESS | 1565 | | GRAVITY_OIL | 49 | | MCF_GAS | 80 | | TUBING_PRESS | 1176 |
| | Perforation Data: | | Interval Top: | 7102 ft. | # Of Holes: | 124 | | Interval Bottom: | 7366 ft. | Hole Size: | 0.41 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 3/14/2011 Interval Top: 7102 ft. Interval Bottom: 7220 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 3/10/2011 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/3/2011 | | Treatment Summary: | NB Perf 7102-7220 Holes 64 Size 0.41
Frac Niobrara A & B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 247,021 gal Slickwater w/ 201,180# 40/70, 4,000# SB Excel
NBRR 1st production date 3/10/2011 and commingled with CODL formation 3/23/2011 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/14/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 32 | | BTU_GAS | 1322 | | CALC_BBLS_OIL | 32 | | CALC_GOR | 4156 | | CALC_MCF_GAS | 133 | | CASING_PRESS | 1500 | | GRAVITY_OIL | 49 | | MCF_GAS | 133 |
| | Perforation Data: | | Interval Top: | 7102 ft. | # Of Holes: | 64 | | Interval Bottom: | 7220 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 01/25/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|